Quick answers
What is Prism Luxuria?
Prism Luxuria is an approved building project in Abrama, Kamrej, Surat, Gujarat. The site covers 1.1 acres.
Who is building it?
The applicant is Kastabhanjan Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 20 Dec 2023), as of 27 Nov 2026.
Where is it?
In Abrama, Kamrej, Surat, Gujarat.
How big is it?
It has a stated cost of ₹31.2 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 20 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Dec 2023 |
| Application filed | 20 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kastabhanjan Developers |
| Land area | 1.1 acres (0.4 ha) |
| Project cost | ₹31.2 crore |
| Village / locality | Abrama |
| Taluk / tehsil | Kamrej |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02057 |
What the filings say
What is planned
Prism Luxuria is a residential-cum-commercial project proposed by Kastabhanjan Developers. The project report describes a development consisting of three buildings (A, B, and C) with a maximum height of 21.35 metres. The buildings are designed with two basement levels, a ground floor, and 14 upper floors.
Building A and Building B are planned as residential towers. Building C is designed as a mixed-use structure, featuring commercial shops on the ground and first floors, with residential units on the floors above. The project includes a total of 164 dwelling units and 10 commercial shops.
| Item | Detail |
|---|---|
| Total Built-up Area | 28,044.75 sq. m. |
| F.S.I. Area | 16,733.29 sq. m. |
| Residential Units | 164 |
| Commercial Units | 10 |
| Tallest Building Height | 21.35 m |
| Number of Floors | G + 14 |
| Basements | 2 |
Layout and design
The project layout includes internal roads of 6.00 metres and 9.00 metres width. The three buildings are arranged around a central open space. Building A and B are located towards the rear of the plot, while Building C faces the 90.00-metre wide Ring Road.
Building C's commercial component consists of eight shops on the ground floor and two large commercial halls on the first floor. The residential units across all buildings are designed as 3BHK apartments. Each typical floor in Building A and B contains four units, while Building C contains four units per floor from the second floor upwards.
Land and surroundings
The project is situated on a plot of 0.43 hectares (1.06 acres) at Abrama in the Kamrej taluk of Surat. The site is bounded by a 90.00-metre wide Ring Road and a 12.00-metre wide Town Planning (TP) road. The applicant states that the net plot area is 4,320.27 sq. m. A common plot area of 441.28 sq. m. is proposed within the site.
Water, power and access
Water requirements will be met through the local municipal supply. The applicant proposes to install three underground water tanks, each with a capacity of 75,000 litres. For wastewater, a 100 KLD (kilolitres per day) Membrane Bioreactor (MBR) type Sewage Treatment Plant (STP) is planned. Treated sewage will be discharged into the Surat Municipal Corporation (SMC) drainage system.
Power will be sourced from the local grid, with Diesel Generator (DG) sets provided for emergency backup. The DG sets will be housed in the basement with acoustic enclosures. The project also includes a 50 KW rooftop solar energy system. Access to the site is provided via the adjacent 12.00-metre and 9.00-metre roads, with internal circulation managed through 6.00-metre wide roads.
Parking is distributed across the two basement levels, the hollow plinth, and open ground-level spaces. The total proposed parking area is 5,755.41 sq. m. for residential use and 374.35 sq. m. for commercial use.
Environmental safeguards
The applicant has planned a green belt covering 724.56 sq. m., which represents approximately 16.77% of the plot area. This includes 283.28 sq. m. of tree cover and 441.28 sq. m. of lawn. Approximately 110 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem are to be planted.
For rainwater management, a collection system with two percolation wells is proposed. Solid waste management will involve an automatic Organic Waste Converter (OWC) with a capacity of 300 kg/day. Dust mitigation measures and acoustic mufflers for machinery are planned for the construction phase.
Timeline
The applicant's environmental management plan states that the entire project is expected to be completed within approximately four years.
Prism Luxuria site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 81% of them.
163 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abrama, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aksharam Waves — environmental approval granted, 50 m away
- Pratishtha Trade Center — environmental approval granted, 150 m away
- Royal Ethics — initial checks, 200 m away
- Green Sky — environmental approval granted, 200 m away
- Tilak Heritage — environmental approval granted, 250 m away
- Blue Stone One — environmental approval granted, 250 m away
- Blue Stone One — environmental approval granted, 250 m away
- Prime Living — environmental approval granted, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.