Quick answers
What is Prime Living?
Prime Living is an approved residential project in Abrama, Kamrej, Surat, Gujarat. It plans 280 units in 4 towers of up to 14 floors on 1.5 acres.
Who is building it?
The applicant is Shree Ganesh Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jun 2026), as of 27 Nov 2026.
Where is it?
In Abrama, Kamrej, Surat, Gujarat.
How big is it?
It has a stated cost of ₹57.7 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 14 Feb 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Jun 2026 |
| Application filed | 14 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shree Ganesh Developers |
| Use | Residential |
| Units | 280 |
| Towers | 4 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Parking spaces | 302 |
| Land area | 1.5 acres (0.6 ha) |
| Built-up area | 36,086 m² (3,88,426 sq ft) |
| Plot area | 6,175 m² (66,467 sq ft) |
| Project cost | ₹57.7 crore |
| Village / locality | Abrama |
| Taluk / tehsil | Kamrej |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10585 |
What the filings say
What is planned
Shree Ganesh Developers has proposed a residential building project named "Prime Living" in Abrama, Surat. According to the applicant's conceptual plan, the project will consist of four residential buildings, designated as Blocks A, B, C, and D-E, containing a total of 280 residential units.
The structures are designed with two basement levels, a hollow plinth, and 14 upper floors. The total built-up area is 36,086.43 square metres. Infrastructural features planned for the society include a clubhouse, a garden with a jogging park, and a children's play area.
Building Configuration
| Block | Floor Configuration | Built-up Area (sq. mt.) |
|---|---|---|
| Block A | 2B + Hollow Plinth + 14 Floors | 7,011.80 |
| Block B | 2B + Hollow Plinth + 14 Floors | 6,709.80 |
| Block C | 2B + Hollow Plinth + 14 Floors | 5,121.91 |
| Block D-E | 2B + Hollow Plinth + 14 Floors | 9,582.00 |
| Total | 36,086.43 |
Layout and design
The project is situated on a plot of 0.62 hectares (1.53 acres). The layout includes a common plot area of 621.43 square metres. The maximum height of the buildings is planned at 44.97 metres.
Parking is distributed across the basement, hollow plinth, and surface areas. The applicant proposes a total parking area of 9,330.24 square metres, providing space for 302 Equivalent Car Spaces (ECS). This includes 233 spaces in the basement, 56 in the hollow plinth, and 13 on the surface. Visitor parking is accounted for with 30 spaces.
Water, power and access
The Surat Municipal Corporation (SMC) will be the primary source of water. During the construction phase, water requirement is estimated at 15 kilolitres per day (KLD). For the operation phase, the total water consumption is projected at 220 KLD, with a fresh water requirement of 129 KLD and 91 KLD to be met through recycled water.
Sewage generation is estimated at 172 KLD. The applicant plans to install a Sewage Treatment Plant (STP) with a capacity of 210 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (87 KLD) and gardening (4 KLD).
Power will be supplied by Dakshin Gujarat Vij Company Limited (DGVCL) with an estimated load demand of 1,500 kW. For emergency backup, three silent diesel generator sets of 125 kVA each are proposed. The project also includes a solar power system with 278 panels providing 150 kW for common area lighting and water pumps.
Access to the site is provided via a 90-metre wide Ring Road, with two entry and exit gates planned for the complex.
Environmental safeguards
The project includes a green belt development covering 700 square metres, where 154 trees of species such as Gul mohar, Limdo, and Gunda will be planted. For rainwater harvesting, two percolation wells with a depth of 40 metres and two storage tanks are proposed.
Solid waste management plans include an on-site organic waste convertor with a capacity of 400 kg per day to process wet waste into manure. Dry waste (estimated at 242 kg/day) will be collected in bins and disposed of at the Khajod disposal site by the local authority.
Timeline
In a notarized undertaking dated February 10, 2026, the applicant stated that no construction activity had been initiated at the site as of that date. Environmental approval for the project was subsequently granted on June 3, 2026.
Prime Living site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is larger than 51% of them.
164 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Abrama, Kamrej, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tilak Heritage — environmental approval granted, 50 m away
- Green Sky — environmental approval granted, 50 m away
- Blue Stone One — environmental approval granted, 100 m away
- Blue Stone One — environmental approval granted, 100 m away
- Divyapath Homes — environmental approval granted, 100 m away
- Navkar Business Centre — environmental approval granted, 150 m away
- Pratishtha Trade Center — environmental approval granted, 150 m away
- Pratishtha Classic — environmental approval granted, 200 m away
All 4 Shree Ganesh Developers projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.