Quick answers
What is this project?
Environmental & CRZ Clearance for Electronic Manufacturing Cluster (EMC) is a proposed industrial project in Tunda, Mundra, Kachchh, Gujarat. The site covers 763.6 acres.
Who is building it?
The applicant is Mundra Solar Technopark Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Tunda, Mundra, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹900 crore and a site of 763.6 acres.
When was it filed?
The application was filed on 26 Jun 2023.
Project details
| Official title | Environmental & CRZ Clearance for Electronic Manufacturing Cluster (EMC) along with Deep Sea Discharge with Diffuser Outfall by M/s. Mundra Solar Technopark Private Limited, at Survey No. 180/P, Village Vandh & Tunda, Taluka Mundra, District Kutch. |
|---|---|
| Status | Returned to applicant |
| Status since | 1 Aug 2023 |
| Application filed | 26 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Mundra Solar Technopark Private Limited |
| Land area | 763.6 acres (309 ha) |
| Project cost | ₹900 crore |
| Village / locality | Tunda |
| Taluk / tehsil | Mundra |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02095 |
In context
160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 763.6 acres, this one is larger than 91% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tunda, Mundra, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to APSEZ Optimizes Mundra Port Waterfront in Kachchh for 514-Million-Tonne Capacity (9.1 km away).
Other projects nearby
- Sea Water Intake of 350 MLD, Desalination Plant & Laying of 320 MLD Deep Sea… — coastal clearance granted, 1.3 km away
- Residential Colony for Solar Manufacturing Business Plant/ Units at area… — initial checks, 1.5 km away
- Mundra Thermal Power Station — lapsed, 1.9 km away
- Transfer of EC/Change in Name subsequent to NCLT Order from Adani Cementation… — lapsed, 2.6 km away
- "Workmen Accommodation – Plot A" Building Construction Project (Residential)… — environmental approval granted, 3.7 km away
- "Workmen Accommodation – Plot A" Building Construction Project (Residential)… — withdrawn, 3.7 km away
- "Workmen Accommodation – Plot A" Building Construction Project (Residential)… — environmental approval granted, 3.7 km away
- Splitting of Environmental Clearance for project activities - Semi Coke Unit:… — lapsed, 3.8 km away
More from Mundra Solar Technopark Private Limited in Kachchh
- Residential Colony for Solar Manufacturing Business Plant/ Units at area… — initial checks
- Sea Water Intake of 350 MLD, Desalination Plant & Laying of 320 MLD Deep Sea… — coastal clearance granted