Quick answers
What is this project?
Gas Compressor Plant (GCP)- III at Kalol, District Gandhinagar, Gujarat by ONGC is a proposed mining project in Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 13.4 acres.
Who is building it?
The applicant is Oil and Natural Gas Corporation (ONGC).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 28 Aug 2023), as of 27 Nov 2026.
Where is it?
In Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹33 crore and a site of 13.4 acres.
When was it filed?
The application was filed on 22 Aug 2023.
Project details
| Official title | Establishment of Gas Compressor Plant (GCP)- III at Kalol, District Gandhinagar, Gujarat |
|---|---|
| Status | Cleared for impact study |
| Status since | 28 Aug 2023 |
| Application filed | 22 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Oil and Natural Gas Corporation (ONGC) |
| Land area | 13.4 acres (5.4 ha) |
| Project cost | ₹33 crore |
| Village / locality | Kalol (M) |
| Taluk / tehsil | Kalol Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02177 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 26 Oct 2026 | More information requested | 13.4 acres | ₹33 crore |
| New project filed 22 May 2026 | Returned to applicant | 13.4 acres | ₹33 crore |
| Early planning filed 22 Aug 2023 (this page) | Cleared for impact study | 13.4 acres | ₹33 crore |
In context
102 applications in Gandhinagar since January 2022 are in the same category (Mining): 47 approved, 20 filed or under review, and 35 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 13.4 acres, this one is larger than 85% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gas Compressor Plant (GCP)- III at Kalol, District Gandhinagar, Gujarat by ONGC — more information requested, 0 m away
- Gas Compressor Plant (GCP)- III at Kalol, District Gandhinagar, Gujarat by ONGC — returned to applicant, 0 m away
- Laying of 4" dia. Steel underground Gas Pipeline — more information requested, 600 m away
- 150 Bedded Hospital for ESIC at Kalol, Gandhinagar, Gujarat — environmental approval granted, 4.4 km away
- Himalaya Heights — environmental approval granted, 4.6 km away
- RANGAM FINE INDUSTRIES (Existing Name) SHREE RAJKRUPA CORPORATION (Proposed… — initial checks, 4.7 km away
- Industrial project by M/s. Sunrise Stainless Pvt. Ltd. — cleared for impact study, 4.9 km away
- Lalji Luxuria — initial checks, 4.9 km away
More from Oil and Natural Gas Corporation (ONGC) in Gandhinagar
- Onshore Development and Production of Oil and Gas from 349 wells to be drilled… — cleared for impact study
- Drilling of Sixteen Exploratory Oil & Gas Wells in Oalp Pel Blocks… — lapsed
- Drilling of Sixteen Exploratory Oil & Gas Wells in Oalp Pel Blocks… — environmental approval granted
- Onshore Development and Production of Oil & Gas from 656 Wells in 52 Blocks in… — cleared for impact study
7 Oil and Natural Gas Corporation (ONGC) projects in Gandhinagar
All 243 Oil and Natural Gas Corporation (ONGC) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.