Quick answers
What is Himalaya Heights?
Himalaya Heights is an approved building project in Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat. The site covers 1.9 acres.
Who is building it?
The applicant is Himalaya Developers.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Jan 2024), as of 27 Nov 2026.
Where is it?
In Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹45.1 crore and a site of 1.9 acres.
When was it filed?
The application was filed on 2 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Jan 2024 |
| Application filed | 2 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Himalaya Developers |
| Land area | 1.9 acres (0.8 ha) |
| Project cost | ₹45.1 crore |
| Village / locality | Kalol (M) |
| Taluk / tehsil | Kalol Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02613 |
What the filings say
What is planned
Himalaya Heights is a mixed-use residential and commercial project proposed by Himalaya Developers. The applicant's project report describes a development consisting of five blocks (Blocks A, B, C, D, and E) with a total of 163 residential units and 29 commercial shops.
The residential component includes:
- 112 units of 2BHK apartments
- 28 units of 3BHK apartments
- 23 units of 4BHK bungalows
The commercial section consists of 29 shops located on the ground floor. The project includes a basement and a hollow plinth level for parking and services. The tallest buildings are planned to have a ground floor plus seven upper floors.
Layout and design
The site layout features a central common plot of 303.50 square metres, with additional common plots (Plot 01 and Plot 02) bringing the total common open space to 788.76 square metres. A 6.00-metre wide approach road and internal driveways ranging from 2.47 metres to 6.03 metres provide access within the complex.
Specific amenities planned include a temple (9.00 square metres) and a society room. The project incorporates a dual plumbing system to separate fresh water from recycled water used for flushing and gardening. Vertical transport is provided by multiple lifts, including dedicated fire lifts in each block.
Water, power and access
The total water requirement for the operation phase is estimated at 160.77 cubic metres per day (KLD). Of this, 102.01 KLD will be fresh water sourced from the Ahmedabad Urban Development Authority (AUDA), while 58.76 KLD will be recycled from the on-site sewage treatment plant (STP). During the construction phase, the project will require 22 KLD, sourced from groundwater or tankers.
Power will be supplemented by a rooftop solar installation with a capacity of 65.4 KW. Access to the site is provided via an 18.00-metre wide Town Planning Scheme (TPS) road.
Environmental safeguards
The applicant proposes several systems to manage waste and emissions:
- Sewage Treatment: An STP with a capacity of 160 KLD will use an aerobic biological process followed by disinfection (chlorination) and filtration (pressure sand and activated carbon filters). Approximately 84.72 KLD of treated sewage will be discharged into the AUDA drain, while the rest is reused.
- Solid Waste: Total waste generation is estimated at 504 kg/day. This includes 168 kg/day of wet waste, which will be treated in an on-site automatic Organic Waste Convertor (OWC). Dry waste (336 kg/day) will be collected and disposed of through an external agency.
- Rainwater Harvesting: Two percolation wells are planned to recharge groundwater.
- Air and Noise: Dust mitigation includes water sprinkling, 3-metre high barricades, and covering transport vehicles. Acoustic enclosures will be provided for the Diesel Generator (DG) set.
- Green Belt: A total of 197 trees are planned for the site.
- Electric Vehicles: The project includes 5 fast chargers for electric vehicles.
Key Figures
| Item | Detail |
|---|---|
| Total Units | 192 (163 Residential, 29 Shops) |
| Total Water Requirement | 160.77 KLD |
| Fresh Water Demand | 102.01 KLD |
| Sewage Generation | 143.48 KLD |
| STP Capacity | 160 KLD |
| Solid Waste Generation | 504 kg/day |
| Solar Power Capacity | 65.4 KW |
| Green Belt Trees | 197 nos. |
| EMP Capital Cost | ₹304.54 lakh |
| CER Budget | ₹80.00 lakh |
Himalaya Heights site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.9 acres, this one is larger than 72% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Aadi Ananta — initial checks, 650 m away
- 150 Bedded Hospital for ESIC at Kalol, Gandhinagar, Gujarat — environmental approval granted, 650 m away
- Mukhar Vind — environmental approval granted, 700 m away
- Lalji Luxuria — initial checks, 850 m away
- Lalji Luxuria — environmental approval granted, 850 m away
- Nirman Bliss — environmental approval granted, 1.2 km away
- To Grant the permission of 0.126 ha Protected Forest land for 66 KV XLPE U/G… — forest land use approved, 1.4 km away
- RANGAM FINE INDUSTRIES (Existing Name) SHREE RAJKRUPA CORPORATION (Proposed… — initial checks, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.