What is Developing? Open the mapMap

Environmental approval grantedBuildings & townships · Ahmadabad, Gujarat

Saffron Sky

Saffron Sky is an approved building project in Kathwada, Daskroi, Ahmadabad, Gujarat. The site covers 1.3 acres. Its stated project cost is ₹41.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 7 Nov 2023).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Saffron Sky

Project details

StatusEnvironmental approval granted
Status since7 Nov 2023
Application filed7 Nov 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantUmeshkumar Thummar
Land area1.3 acres (0.5 ha)
Project cost₹41.8 crore
Village / localityKathwada
Taluk / tehsilDaskroi
DistrictAhmadabad
StateGujarat
Location fromSite area on record
Our referenceWID-GJ-02330

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 26 Jul 2024Environmental approval granted1.3 acres₹41.8 crore
New project filed 7 Nov 2023 (this page)Environmental approval granted1.3 acres₹41.8 crore

What the filings say

What is planned

Saffron Sky is a mixed-use residential and commercial development proposed by the applicant. According to the project documents, the development will consist of five blocks with varying heights and two basement levels for parking. The residential component includes 162 flats, while the commercial section will feature 9 shops.

The building configurations are planned as follows:

The total built-up area for the project is 30,112.33 square metres, with a total Floor Space Index (FSI) area of 14,323.62 square metres. The ground floor is designed to accommodate a hollow plinth for parking alongside the commercial units.

ItemDetail
Total Built-up Area30,112.33 sq. m
Residential Units162 flats
Commercial Units9 shops
Total Parking Capacity253 cars
Sewage Treatment Plant Capacity150 KLD
Green Belt Area859.34 sq. m
Solar Power Generation115 KW

Layout and design

The site layout includes a central common plot measuring 540.14 square metres, which represents approximately 10% of the total plot area. The two basement levels (1st and 2nd basement) are dedicated to car parking and utility services. The applicant has proposed a dual plumbing system to separate fresh water and recycled water lines.

Vertical circulation will be managed through 10 lifts across the blocks, including dedicated fire lifts. The staircases are designed with a width of 2.02 metres for the taller blocks and 2.00 metres for the shorter blocks to facilitate emergency evacuation.

Land and surroundings

The project is situated on a plot of 0.54 hectares (1.33 acres) in Kathwada village. The site is bordered by a 24.00-metre wide Town Planning Scheme (TPS) road on one side. The surroundings consist primarily of other final plots (F.P. Nos. 28/1, 37, 161, 36, and 27/2). The applicant states that the structural design will strictly adhere to seismic zone norms for earthquake resistance.

Water, power and access

During the operation phase, the total water requirement is estimated at 116 kilolitres per day (KLD). Of this, 74.5 KLD will be fresh water sourced from the Ahmadabad Municipal Corporation (AMC), while 41.5 KLD will be met through treated sewage for flushing and gardening. During the construction phase, water needs are estimated at 12.25 KLD, to be supplied by AMC or local tankers.

Power will be sourced from the local grid, supplemented by a 125 KVA diesel generator set for emergency backup. The applicant also plans to install solar panels on the rooftops to generate 115 KW of renewable energy.

Environmental safeguards

The applicant proposes to treat 88.5 KLD of generated sewage in an on-site Sewage Treatment Plant (STP) with a capacity of 150 KLD. For solid waste management, an Organic Waste Convertor (OWC) will be installed to process biodegradable waste into useful end products. Recyclable materials will be sold to authorized vendors.

A green belt of 859.34 square metres will be developed, including the plantation of 133 trees. Rainwater management includes the installation of two percolation wells to recharge ground water. Fire safety provisions include a 1,00,000-litre underground water tank and 20,000-litre overhead tanks for each block, along with automatic sprinklers in the basements.

Saffron Sky site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Saffron Sky: Master layout plan: building blocks, common plot and internal roads (preview)🔒 Sign in free to see it
Master layout plan: building blocks, common plot and internal roads
Saffron Sky: Basement plans: 1st and 2nd level parking and utility layouts (preview)🔒 Sign in free to see it
Basement plans: 1st and 2nd level parking and utility layouts
Saffron Sky: Building elevation and cross-section showing floor heights (preview)🔒 Sign in free to see it
Building elevation and cross-section showing floor heights
Saffron Sky: Revised site layout plan with drainage and fire hydrant details (preview)🔒 Sign in free to see it
Revised site layout plan with drainage and fire hydrant details

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.3 acres, this one is smaller than 63% of them.

234 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kathwada, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.