Project details
| Status | Under environmental review |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 24 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shreeram Developers |
| Land area | 3,000 m² |
| Project cost | ₹38.4 crore |
| Village / locality | Kathwada |
| Taluk / tehsil | Daskroi |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11046 |
What the filings say
What is planned
SHREERAM DEVELOPERS (also referred to as Shree Ram Developers) proposes the construction of Mangalam Heights, a mixed-use residential and commercial project. According to the applicant's project report, the development will consist of three blocks with two levels of basements, a ground floor, and 14 upper floors.
The project is designed to accommodate 168 residential units and 8 commercial units. The residential component is classified as Affordable Housing (RAH) under the General Agricultural Zone (A1) and Overlay Zone.
Project Components
| Item | Detail |
|---|---|
| Total Built-up Area | 22,383.07 sq. m. |
| Plot Area | 3,014.57 sq. m. |
| Number of Blocks | 3 |
| Tallest Building | Ground + 14 Floors |
| Residential Units | 168 |
| Commercial Units | 8 |
| Basement Levels | 2 |
Layout and design
The layout plan indicates that the three blocks (Block A, Block B, and Block C) are arranged around a central common plot measuring 302.16 sq. m. Block A is a standalone structure, while Blocks B and C are connected.
The ground floor will feature commercial shops in Block A, while the remaining ground floor area across all blocks is designated as hollow plinth parking. Residential units begin from the first floor and extend to the 14th floor. Refuge areas are planned on the 5th, 8th, and 12th floors of each block for safety. The terrace level will house stair cabins, lift machine rooms, and overhead water tanks.
Water, power and access
Water requirements during both the construction and operation phases will be met through the Ahmedabad Municipal Corporation (AMC). For the operation phase, the applicant proposes using low-water-consuming devices such as diffused water taps and twin flushing systems. Domestic sewage will be disposed of through the AMC drainage line.
Power will be sourced from the local electrical company. The applicant plans to install a rooftop solar energy system for generation as per building regulations. Emergency power backup will be provided by a diesel generator set, which will be housed in an acoustic enclosure with an appropriate stack height.
Access to the site is provided by an 18.00-metre wide Town Planning (TP) road. Internal movement is facilitated by 6.00-metre wide approach roads and a 6.13-metre wide ramp leading to the two basement levels.
Environmental safeguards
The applicant's Environmental Management Plan (EMP) outlines several mitigation measures:
- Air and Noise: Use of tarpaulin covers for construction materials, regular water sprinkling to suppress dust, and peripheral barricading. All vibrating machinery will be enclosed in sound-proofing where necessary.
- Water Management: Rainwater harvesting structures will be erected to collect and recharge groundwater. A 150 kilolitre per day (KLD) Moving Bed Biofilm Reactor (MBBR) type Sewage Treatment Plant (STP) is planned, requiring approximately 70 sq. m. of area.
- Waste Management: Municipal solid waste will be segregated into dry and wet waste. Wet waste will be processed in an organic waste composter on-site, and the resulting compost will be used for greenbelt development.
- Greenbelt: A greenbelt consisting of 76 trees and lawn areas will be developed within and around the premises.
- Fire Safety: The project will include a hydrant system, automatic sprinklers in the basement, fire extinguishers, and fire lifts. An underground water storage tank of 1,00,000 litres and an overhead tank of 20,000 litres are dedicated to fire safety.
Timeline
The estimated capital cost for environmental management during the construction phase is approximately ₹2.98 crore, with a recurring annual cost of ₹16.85 lakh during the operation phase.
Mangalam Heights site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0.7 acres, this one is smaller than 98% of them.
238 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathwada, Daskroi, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ganesh Exotica — environmental approval granted, 150 m away
- Saffron Sky — environmental approval granted, 200 m away
- Saffron Sky — environmental approval granted, 200 m away
- Saffron Sky — environmental approval granted, 200 m away
- Rudra Elegance — environmental approval granted, 200 m away
- Rudra Elegance — environmental approval granted, 200 m away
- The Glorious — environmental approval granted, 200 m away
- Shlok Serenity — environmental approval granted, 250 m away