Quick answers
What is this project?
Proposed high-rise residential construction project (G+13) promoted by Hasmukhbhai Rajivbhai Ahir is located at New R.S. No.248+260+261+264/1/Paikee Sub Plot No.2 Paikee Sub Div. No:6, T.P.S. No.75 (Vesu – Magdalla – Gavier - Abhava), Village: Vesu, Ta.: Majura, Dis.: Surat-395007 is a proposed building project in Vesu, Majura, Surat, Gujarat. The site covers 11.9 acres.
Who is building it?
The applicant is Sukhiben Ahir.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Jun 2023), as of 27 Nov 2026.
Where is it?
In Vesu, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹395.2 crore and a site of 11.9 acres.
When was it filed?
The application was filed on 19 Jun 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed high-rise residential construction project (G+13) promoted by Hasmukhbhai…
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Jun 2023 |
| Application filed | 19 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Sukhiben Ahir |
| Land area | 11.9 acres (4.8 ha) |
| Project cost | ₹395.2 crore |
| Village / locality | Vesu |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02417 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Jan 2024 | Environmental approval granted | 11.9 acres | ₹395.2 crore |
| Early planning filed 19 Jun 2023 (this page) | Cleared for impact study | 11.9 acres | ₹395.2 crore |
In context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.9 acres, this one is larger than 95% of them.
126 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vesu, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed high-rise residential construction project (G+13) promoted by… — environmental approval granted, 0 m away
- Nityaanta — environmental approval granted, 250 m away
- Satva — more information requested, 300 m away
- Millenium Aantara — environmental approval granted, 300 m away
- Residential Building Project by Ajaykumar Boghawla — environmental approval granted, 450 m away
- Bblossom - The Oasis — environmental approval granted, 500 m away
- The Identity — environmental approval granted, 700 m away
- Triyom Casa — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.