Quick answers
What is this project?
Proposed high-rise residential construction project (G+13) promoted by Hasmukhbhai Rajivbhai Ahir is located at New R.S. No.248+260+261+264/1/Paikee Sub Plot No.2 Paikee Sub Div. No:6, T.P.S. No.75 (Vesu – Magdalla – Gavier - Abhava), Village: Vesu, Ta.: Majura, Dis.: Surat-395007 is an approved residential project in Vesu, Majura, Surat, Gujarat. It plans 1,196 units in 29 towers of up to 13 floors on 11.9 acres.
Who is building it?
The applicant is Sukhiben Ahir.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jun 2024), as of 27 Nov 2026.
Where is it?
In Vesu, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹395.2 crore and a site of 11.9 acres.
When was it filed?
The application was filed on 31 Jan 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Jun 2024 |
| Application filed | 31 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Sukhiben Ahir |
| Use | Residential |
| Units | 1,196 |
| Towers | 29 |
| Floors (tallest) | 13 |
| Basements | 2 |
| Height | 44 m |
| Parking spaces | 3,180 |
| Land area | 11.9 acres (4.8 ha) |
| Built-up area | 3,30,348 m² (35,55,833 sq ft) |
| Plot area | 47,955 m² (5,16,183 sq ft) |
| Project cost | ₹395.2 crore |
| Village / locality | Vesu |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06548 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Jan 2024 (this page) | Environmental approval granted | 11.9 acres | ₹395.2 crore |
| Early planning filed 19 Jun 2023 | Cleared for impact study | 11.9 acres | ₹395.2 crore |
In context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 11.9 acres, this one is larger than 95% of them.
126 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vesu, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed high-rise residential construction project (G+13) promoted by… — cleared for impact study, 0 m away
- Nityaanta — environmental approval granted, 250 m away
- Satva — more information requested, 300 m away
- Millenium Aantara — environmental approval granted, 300 m away
- Residential Building Project by Ajaykumar Boghawla — environmental approval granted, 450 m away
- Bblossom - The Oasis — environmental approval granted, 500 m away
- The Identity — environmental approval granted, 700 m away
- Triyom Casa — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.