Environmental approval grantedBuildings & townships · Surat, Gujarat

Veer Arihanta

Veer Arihanta is an approved mixed-use project in Pal, Majura, Surat, Gujarat. It plans 204 units in 4 towers of up to 13 floors on 2.1 acres. Its stated project cost is ₹83.1 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 22 Dec 2024).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Veer Arihanta?

Veer Arihanta is an approved mixed-use project in Pal, Majura, Surat, Gujarat. It plans 204 units in 4 towers of up to 13 floors on 2.1 acres.

Who is building it?

The applicant is Pearl Developers.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 22 Dec 2024), as of 27 Nov 2026.

Where is it?

In Pal, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹83.1 crore and a site of 2.1 acres.

When was it filed?

The application was filed on 15 Jul 2024.

Project details

StatusEnvironmental approval granted
Status since22 Dec 2024
Application filed15 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantPearl Developers
UseMixed use
Units204
Towers4
Floors (tallest)13
Basements1
Height45 m
Parking spaces251
Land area2.1 acres (0.9 ha)
Built-up area41,072 m² (4,42,095 sq ft)
Plot area8,558 m² (92,117 sq ft)
Project cost₹83.1 crore
Village / localityPal
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-02563

What the filings say

What is planned

The applicant, Pearl Developers, proposes the construction of a residential and commercial complex named "Veer Arihanta" at Pal in Surat. According to the conceptual plan, the project consists of four buildings (Blocks A, B, C, and D), each rising to 13 floors above a basement and a hollow plinth.

The development is divided into two residential-cum-commercial buildings and two purely residential buildings. It will house a total of 174 residential units and 30 commercial units. The total built-up area is specified as 41,072.41 square metres on a plot of 0.86 hectares (2.12 acres).

ItemDetail
Total Built-up Area41,072.41 sq. mt.
Residential Units174
Commercial Units30
Tallest Building13 Floors
Total Water Demand134 KLD
Fresh Water Requirement77.8 KLD
STP Capacity130 KLD
Power Requirement1,100 KW
Solar Power Capacity110 kW
Green Belt Area900 sq. mt.
Parking Provided251 ECS

Layout and design

The site layout includes a children's play area, a garden with a jogging park, and a clubhouse for the society. The ground floor plan also indicates space for a pathshala and a banquet hall. Parking is planned across the basement, hollow plinth, and surface areas, providing a total of 251 Equivalent Car Spaces (ECS). The buildings are designed to reach a height of approximately 44.90 metres.

Water, power and access

The total water requirement during the operational phase is estimated at 134 kilolitres per day (KLD). Of this, 77.8 KLD will be fresh water sourced from the Surat Municipal Corporation (SMC), while 56.2 KLD will be met through recycled treated water. The project is expected to generate 104.4 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 130 KLD using Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing (52.2 KLD) and gardening (4 KLD).

The electrical load is estimated at 1,100 KW, to be supplied by Dakshin Gujarat Vij Company Limited (DGVCL). For emergency backup, the applicant proposes to install two silent diesel generator sets of 125 KVA each. Access to the site is provided by adjacent 15-metre and 30-metre wide public roads.

Environmental safeguards

The applicant plans to develop a green belt covering 900 square metres, which is approximately 10.5% of the plot area, with 214 trees. For solid waste management, an Organic Waste Convertor (OWC) with a capacity of 250 kg per day will be installed to process kitchen waste into manure. Total solid waste generation is estimated at 396 kg per day, including 238 kg of wet waste and 158 kg of dry waste.

Energy conservation measures include the installation of 204 solar panels on the rooftops, providing 110 kW of solar power for common area lighting, water pumps, and electric vehicle charging points. The project also includes three rainwater harvesting borewells to recharge groundwater. The applicant has budgeted ₹7.77 crore for the Environmental Management Plan capital costs.

Veer Arihanta site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Veer Arihanta: Site plan and key plan: building blocks, roads and open spaces (preview)🔒 Sign in free to see it
Site plan and key plan: building blocks, roads and open spaces
Veer Arihanta: Building section: basement, parking levels and 13 residential floors (preview)🔒 Sign in free to see it
Building section: basement, parking levels and 13 residential floors
Veer Arihanta: Front elevation of the proposed towers (preview)🔒 Sign in free to see it
Front elevation of the proposed towers
Veer Arihanta: Ground floor layout: commercial shops, foyers and parking areas (preview)🔒 Sign in free to see it
Ground floor layout: commercial shops, foyers and parking areas

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 2.1 acres, this one is larger than 69% of them.

134 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Pal, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.