What is Vasupujya Rio Crest?
Vasupujya Rio Crest is a withdrawn building project in Pal, Majura, Surat, Gujarat. The site covers 1.5 acres.
Who is building it?
The applicant is Vasupujya Infrastructures LLP.
Has it been approved?
No. The application was withdrawn on 18 Feb 2026, so it is no longer under consideration.
Where is it?
In Pal, Majura, Surat, Gujarat.
How big is it?
It has a stated cost of ₹224 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 18 Feb 2026.
One of 3 filings for this project. The project's main page, with every filing and where each stands: Vasupujya Rio Crest
Project details
| Status | Withdrawn |
|---|---|
| Status since | 18 Feb 2026 |
| Application filed | 18 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vasupujya Infrastructures LLP |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹224 crore |
| Village / locality | Pal |
| Taluk / tehsil | Majura |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10023 |
All filings for this project
This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 14 Mar 2026 | Environmental approval granted | 1.5 acres | ₹224 crore |
| New project filed 18 Feb 2026 (this page) | Withdrawn | 1.5 acres | ₹224 crore |
| Ownership transfer filed 19 Dec 2025 | Environmental approval granted | 1.5 acres | ₹224 crore |
What the filings say
What is planned
Vasupujya Infrastructures LLP proposes to expand and amend a previously granted environmental clearance for a commercial high-rise building project in Pal, Surat. The applicant's project report states that the project, named Vasupujya Rio Crest, will consist of a single commercial building with a maximum height of 142.79 metres.
The building is planned to have 40 floors above a ground floor (hollow plinth) and three basement levels. The scope of the project has increased significantly from the original plan, which envisioned an 11-floor building. The total built-up area is now 75,199.9 square metres, with a Floor Space Index (FSI) area of 31,618.47 square metres.
Commercial Units
The project will house a total of 327 commercial units, including shops and offices, distributed across the 40 floors. The ground floor will contain eight shops, while the upper floors will feature varying numbers of units, typically ranging from six to 14 per floor. Two restaurants are also planned within the building. The applicant estimates a total population of 3,404 persons, comprising 2,194 workers and 1,210 visitors.
Layout and design
The project is situated on a plot of 5,857 square metres. The ground coverage is 2,436.52 square metres. The building design incorporates a high-rise structure that adheres to the Gujarat Comprehensive General Development Control Regulations (CGDCR) for tall buildings, which applies to structures exceeding 100 metres in height.
Parking is provided across multiple levels, including the three basements, the hollow plinth, surface areas, and five layers of mechanical or stack parking. A total of 606 Equivalent Car Spaces (ECS) are proposed, covering an area of 18,376.5 square metres. The design includes separate entry and exit points for the ground floor and dedicated ramps for the basement and upper-layer parking.
Water, power and access
During the construction phase, water will be sourced from tankers, with a requirement of 14 cubic metres per day (m3/d). For the operation phase, the Surat Municipal Corporation (SMC) will be the primary water source. The total water requirement is estimated at 122 m3/d, of which 64.78 m3/d will be fresh water and 57.22 m3/d will be recycled from the on-site sewage treatment plant (STP).
Power requirement for the project is 1,489 KW. Two diesel generator sets of 125 KVA each are proposed for emergency backup, specifically for fire lifts and pumps. The project site abuts a 60-metre wide Town Planning (TP) road.
Environmental safeguards
The applicant proposes several measures to manage environmental impact:
- Sewage Treatment: An on-site STP with a capacity of 110 m3/d will use Moving Bed Biofilm Reactor (MBBR) technology. Treated water will be reused for flushing and gardening via a dual plumbing system.
- Waste Management: An Organic Waste Convertor (OWC) will process approximately 175.52 kg/day of wet domestic waste. Dry waste (263.28 kg/day) will be sold to vendors.
- Green Belt: A green belt of 586 square metres (approximately 10% of the plot) will be developed, including the plantation of 150 trees along the periphery.
- Rainwater Harvesting: Two percolation wells are planned for groundwater recharge.
- Energy Conservation: Measures include 75 KW of rooftop solar panels, LED lighting, and solar-powered street lights.
Fire and Safety
As a high-rise building, the project includes extensive fire protection systems:
- Two underground static water storage tanks of 2,00,000 litres each and a 20,000-litre terrace tank.
- Automatic sprinkler systems in the basements.
- Wet risers, hose reels, and fire extinguishers at each floor.
- Three dedicated fire lifts and two internal staircases of 2.0 metres width.
- Carbon monoxide (CO) and oxygen sensors in the basement to trigger mechanical ventilation.
| Item | Detail |
|---|---|
| Total Built-up Area | 75,199.9 m2 |
| FSI Area | 31,618.47 m2 |
| Maximum Building Height | 142.79 m |
| Total Commercial Units | 327 |
| Total Parking (ECS) | 606 |
| STP Capacity | 110 KLD |
| Fresh Water Demand | 64.78 KLD |
| Green Belt Area | 586 m2 |
| Project Cost | ₹226.73 crore |
Vasupujya Rio Crest site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is smaller than 53% of them.
141 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pal, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Vasupujya Rio Crest — environmental approval granted, 0 m away
- Vasupujya Rio Crest — environmental approval granted, 0 m away
- "vasupujya" — environmental approval granted, 0 m away
- Elinor — environmental approval granted, 300 m away
- Residential Building Project by Vinod Patel — environmental approval granted, 300 m away
- "casa Vista" — environmental approval granted, 350 m away
- Sky Villa — lapsed, 400 m away
- Veer Arista — environmental approval granted, 500 m away
All 3 Vasupujya Infrastructures projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.