Quick answers
What is this project?
This approved mining project by M/s. Ashapura International Limited. QL No. - 10729 is in Daban, Abdasa, Kachchh, Gujarat. The site covers 5.3 acres.
Who is building it?
The applicant is M/S Ashapura Mines.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Jul 2025), as of 27 Nov 2026.
Where is it?
In Daban, Abdasa, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh and a site of 5.3 acres.
When was it filed?
The application was filed on 8 Apr 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Jul 2025 |
| Application filed | 8 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | M/S Ashapura Mines |
| Land area | 5.3 acres (2.1 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Daban |
| Taluk / tehsil | Abdasa |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02570 |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5.3 acres, this one is smaller than 54% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Daban, Abdasa, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jusab Ibrahim Kumbhar. Survey No.- 59 — withdrawn, 4 km away
- Jusab Ibrahim Kumbhar — withdrawn, 4 km away
- Jusab Ibrahim Kumbhar. — environmental approval granted, 4 km away
- Dangar Dilip Bhura. Area-2.37.56 — under environmental review, 4.1 km away
- Laying of Underground OFC to Road side protected Forest land of Bhuj Lakhpat… — more information requested, 4.5 km away
- Regularization of existing EC — lapsed, 4.5 km away
- Diversion of Forest area for the Construction of Sump and approach road in… — lapsed, 6.1 km away
- Mining project by Shree Crust Minechem PVT. LTD. — cleared for impact study, 11.7 km away
More from M/S Ashapura Mines in Kachchh
- Mining project by M/s Ashapura International Ltd — initial checks
- Shri Chetan Navnitlal Shah Area-1.85.00 — under environmental review
- Shri Chetan Navnitlal Shah (Balachod Nani Survey No.- 111) — cleared for impact study
- Mining project by M/s. Ashapura Minechem Ltd. Survey No. - 183 Paiki QL No-… — environmental approval granted
- Shri Chetan Navnitlal Shah Survey No.- 425 — under environmental review
- Shri Chetan Navnitlal Shah Sr No. - 335 — lapsed
All 27 Ashapura Mines projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.