Jusab Ibrahim Kumbhar is a withdrawn mining project in Ukharda, Nakhatrana, Kachchh, Gujarat. The site covers 2.8 acres.
Who is building it?
The applicant is Jusab Ibrahim Kumbhar.
Has it been approved?
No. The application was withdrawn on 19 May 2025, so it is no longer under consideration.
Where is it?
In Ukharda, Nakhatrana, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹4.8 crore and a site of 2.8 acres.
When was it filed?
The application was filed on 19 May 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Jusab Ibrahim Kumbhar.
Project details
| Status | Withdrawn |
|---|---|
| Status since | 19 May 2025 |
| Application filed | 19 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Jusab Ibrahim Kumbhar |
| Land area | 2.8 acres (1.1 ha) |
| Project cost | ₹4.8 crore |
| Village / locality | Ukharda |
| Taluk / tehsil | Nakhatrana |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-07605 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Oct 2025 | Environmental approval granted | 2.8 acres | ₹4.8 crore |
| New project filed 19 May 2025 (this page) | Withdrawn | 2.8 acres | ₹4.8 crore |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.8 acres, this one is smaller than 91% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Ukharda, Nakhatrana, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jusab Ibrahim Kumbhar. Survey No.- 59 — withdrawn, 0 m away
- Jusab Ibrahim Kumbhar. — environmental approval granted, 0 m away
- Dangar Dilip Bhura. Area-2.37.56 — under environmental review, 200 m away
- Regularization of existing EC — lapsed, 3.7 km away
- Mining project by M/s. Ashapura International Limited. QL No. - 10729 — environmental approval granted, 4 km away
- Laying of Underground OFC to Road side protected Forest land of Bhuj Lakhpat… — more information requested, 7.9 km away
- Diversion of Forest area for the Construction of Sump and approach road in… — lapsed, 8.6 km away
- MutwaJafarullhakKhanan SURVEY NO.-147 Paiki, QL NO. 14723 — environmental approval granted, 10.2 km away
More from Jusab Ibrahim Kumbhar in Kachchh
- Jusab Ibrahim Kumbhar. Survey No.- 59 — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.