Quick answers
What is Nirman Bliss?
Nirman Bliss is an approved residential project in Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat. It plans 134 units in 3 towers of up to 14 floors on 1.5 acres.
Who is building it?
The applicant is Bliss Construction.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 11 Aug 2024), as of 27 Nov 2026.
Where is it?
In Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹65.6 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 21 May 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Aug 2024 |
| Application filed | 21 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bliss Construction |
| Use | Residential |
| Units | 134 |
| Towers | 3 |
| Floors (tallest) | 14 |
| Basements | 1 |
| Parking spaces | 220 |
| Land area | 1.5 acres (0.6 ha) |
| Built-up area | 27,312 m² (2,93,984 sq ft) |
| Plot area | 6,100 m² (65,660 sq ft) |
| Project cost | ₹65.6 crore |
| Village / locality | Kalol (M) |
| Taluk / tehsil | Kalol Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-04757 |
What the filings say
What is planned
Bliss Construction is proposing a residential building project named Nirman Bliss in Kalol, Gandhinagar. The applicant's project report describes a development consisting of three blocks (A, B, and C) with a maximum height of 14 floors above ground, plus a basement for parking.
The project is designed to accommodate 134 residential units. The floor-wise distribution is planned as follows:
- Basement: Dedicated to parking (2,636.82 square metres).
- Ground Floor: Includes hollow plinth parking, an electric meter room, and 375.49 square metres of common amenities for society members.
- 1st to 13th Floors: Residential apartments, with 10 units per floor across the blocks.
- 14th Floor: Four residential units with open terrace areas.
Common amenities on the ground floor are planned to include a library, banquet hall, gymnasium, indoor games area, and a society kitchen.
Layout and design
The project site covers 0.61 hectares (1.51 acres). The layout plan shows a central building footprint with a 6.0-metre wide clear margin around the periphery to allow for fire tender movement. A 6.0-metre wide ramp with a 1:7 slope provides access to the basement parking.
The residential blocks are arranged around central foyers and cut-outs for ventilation. Block A and Block C are the larger wings, while Block B is a smaller connecting or adjacent section. The typical floor plan (2nd to 13th floors) indicates units ranging from approximately 100.78 to 105.36 square metres of RERA carpet area. The 14th-floor units are larger, with carpet areas up to 131.96 square metres, supplemented by significant open terrace spaces.
Water, power and access
During the construction phase, water will be sourced from local tankers. For the operation phase, the applicant plans to obtain water from the local municipal supply. The total water requirement is estimated at 150 kilolitres per day (KLD).
Power will be supplied by the local electricity board. The project includes a 67 KW rooftop solar energy system to assist with common area lighting. A diesel generator (DG) set with an acoustic enclosure is planned for emergency backup. Access to the site is provided via an 18.0-metre wide Town Planning Scheme (TPS) road.
Environmental safeguards
The applicant has proposed an Environmental Management Plan (EMP) with a capital budget of ₹2.52 crore. Key features include:
- Wastewater: An onsite Sewage Treatment Plant (STP) using Activated Sludge Process technology will treat 150 KLD of sewage. Treated water will be reused for gardening and flushing.
- Solid Waste: An automatic Organic Waste Converter (OWC) with a capacity of 250 kg/day will process wet waste into compost for the greenbelt. Dry waste will be collected by the local authority.
- Rainwater: Two percolation wells are planned for groundwater recharging.
- Greenbelt: The plan includes planting 153 trees and developing lawn areas within the premises.
- Air & Noise: Dust mitigation measures such as 10-metre high wind-breakers and water sprinkling will be used during construction. Acoustic enclosures and peripheral compound walls will help manage noise levels.
Key figures
| Item | Detail |
|---|---|
| Total Built-up Area | 27,312.49 sq. m. |
| F.S.I. Area | 16,461.05 sq. m. |
| Residential Units | 134 |
| Maximum Floors | G + 14 |
| Common Plot Area | 623.43 sq. m. |
| STP Capacity | 150 KLD |
| Solar Power Capacity | 67 KW |
| Estimated Trees | 153 |
Nirman Bliss site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is larger than 56% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kalol (M), Kalol Gandhinagar, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Lalji Luxuria — initial checks, 450 m away
- Lalji Luxuria — environmental approval granted, 450 m away
- To Grant the permission of 0.126 ha Protected Forest land for 66 KV XLPE U/G… — forest land use approved, 550 m away
- Mukhar Vind — environmental approval granted, 650 m away
- 150 Bedded Hospital for ESIC at Kalol, Gandhinagar, Gujarat — environmental approval granted, 950 m away
- Himalaya Heights — environmental approval granted, 1.2 km away
- Aadi Ananta — initial checks, 1.4 km away
- Industrial project by M/s. Sunrise Stainless Pvt. Ltd. — cleared for impact study, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.