Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 27 Sept 2025 |
| Application filed | 25 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Rajnikant Patel |
| Use | Mixed use |
| Units | 266 |
| Towers | 8 |
| Floors (tallest) | 7 |
| Basements | 1 |
| Parking spaces | 297 |
| Land area | 1.7 acres (0.7 ha) |
| Built-up area | 27,531 m² (2,96,341 sq ft) |
| Plot area | 6,982 m² (75,154 sq ft) |
| Project cost | ₹25 crore |
| Village / locality | Gorva |
| Taluk / tehsil | Vadodara Rural |
| District | Vadodara |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02674 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 25 Dec 2024 (this page) | Environmental approval granted | 1.7 acres | ₹25 crore |
| New project filed 18 May 2023 | Environmental approval granted | 1.7 acres | ₹25 crore |
What the filings say
What is planned
AL-Makkah Heights is a residential cum commercial project proposed by Patel Rajnikantbhai Trikambhai. The project is an expansion of an earlier proposal, with the total built-up area increasing from 26,321.99 square metres to 27,530.87 square metres due to minor planning changes. The applicant's project report states that the development is located on a plot of 6,982 square metres (0.7 hectares).
The project consists of eight buildings, each with a basement, a ground floor or hollow plinth for parking, and seven upper floors. The development will provide a total of 224 residential flats and 42 commercial shops. The buildings reach a maximum height of 24.45 metres.
| Item | Detail |
|---|---|
| Plot Area | 6,982 sq. m. (0.7 ha) |
| Total Built-up Area | 27,530.87 sq. m. |
| Permissible FSI | 18,851.40 sq. m. |
| Proposed FSI Area | 18,302.55 sq. m. |
| Number of Buildings | 8 |
| Building Configuration | B + G/P + 7 Floors |
| Total Residential Units | 224 Flats |
| Total Commercial Units | 42 Shops |
| Expected Residents | 1,008 occupants |
| Expected Visitors | 200 |
Layout and design
The layout includes eight blocks (A to H). Blocks A, B, and C have a floor area of 387 square metres each, while Blocks D through H range from 306.11 to 306.85 square metres per floor. Each block is equipped with two lifts, including one designated as a fire lift. The travel distance for emergency evacuation ranges from 12 to 17 metres depending on the block.
Parking is distributed across three levels: a partially mechanical basement (7,190.15 square metres), a hollow plinth (1,730.24 square metres), and open surface areas (218.31 square metres). The total parking provision is 9,138.7 square metres, intended to accommodate 297 Equivalent Car Spaces (ECS). The applicant has committed to providing electric vehicle charging stations for 60 of these spaces.
Water, power and access
During the operation phase, the total water requirement is estimated at 148 kilolitres per day (KLD). Of this, 94 KLD will be fresh water supplied by the Vadodara Mahanagar Seva Sadan (VMSS), while 54 KLD will be recycled from treated sewage for flushing and gardening. For the construction phase, a requirement of 23 KLD will be met through authorized tankers.
Power will be sourced from Madhya Gujarat Vij Company Limited (MGVCL), with a maximum demand of 1,200 kW and a connected load of 1,640 kW. Two diesel generator sets of 125 kVA each are proposed for emergency backup. Energy conservation measures include the installation of 205 solar panels with a capacity of 82 kW, intended to power common area lighting and water pumps.
The site is accessed via a 24-metre wide road on the north and an 18-metre wide road on the west. Internal roads will be 6 metres wide to allow for fire tender movement.
Environmental safeguards
The project will include an onsite Sewage Treatment Plant (STP) with a capacity of 150 KLD using electrolysis technology. Treated water will be reused within the premises, with any surplus discharged into the VMSS sewer line. For solid waste, an Organic Waste Convertor (OWC) with a capacity of 215 kg per day will process biodegradable waste, while non-biodegradable waste will be sold to vendors.
A green belt covering 1,050 square metres (15% of the plot area) is planned, which includes a 351 square metre tree-covered area. The applicant proposes to plant 175 trees of species such as Bel, Neem, Palas, and Ashoka. Rainwater harvesting will be managed through two percolation wells, with the groundwater table noted at a depth of 40 metres.
Timeline
The applicant stated in July 2023 that no construction activity had started at the site. As of the expansion filing in late 2024, a built-up area of 630.85 square metres had been constructed, consisting of five blocks at the basement and ground level.
Al-Makkah Heights site plan and layout
2 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
179 applications in Vadodara since January 2022 are in the same category (Buildings & townships): 123 approved, 36 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 1.7 acres, this one is smaller than 59% of them.
45 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gorva, Vadodara Rural, Vadodara, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- AL-Makkah Heights — environmental approval granted, 0 m away
- Addition of Construction activity at Alembic City West (Final Phase) — more information requested, 1.6 km away
- Addition of Construction activity at Alembic City West (Final Phase) — cleared for impact study, 1.6 km away
- Addition of Construction activity at Alembic City West (Phase III) — environmental approval granted, 1.6 km away
- Addition of Construction activity at Alembic city West (Phase II) — environmental approval granted, 1.6 km away
- Pradhan Mantri Awas Yojana 2.0 (Urban) Package-2 — initial checks, 1.8 km away
- Proposed Construction of Commercial Buildings and MLCP — initial checks, 1.8 km away
- Proposed Construction of Commercial Buildings – "Banyan Court Offices" — more information requested, 1.9 km away
More from Rajnikant Patel in Vadodara
- Shri Rajnikant Mahijibhai Patel — initial checks
- Shri Rajnikant Mahijibhai Patel — cleared for impact study
About this information