Quick answers
What is this project?
This approved mining project by M/s Shakti Metal C/o. Smt Khalapiben Vasavabhai Vasava. Re-appraisal Area-1.90.27 Survey no. - 27/97 Block No-42 (Pvt. Land). Village- Kantvav, Taluka – Mangrol, Dist- Surat(Gujarat) is in Kantvav, Mangrol, Surat, Gujarat. The site covers 4.7 acres.
Who is building it?
The applicant is Shakti Metal.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 24 Feb 2025), as of 27 Nov 2026.
Where is it?
In Kantvav, Mangrol, Surat, Gujarat.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 4.7 acres.
When was it filed?
The application was filed on 4 Oct 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 24 Feb 2025 |
| Application filed | 4 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shakti Metal |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Kantvav |
| Taluk / tehsil | Mangrol |
| District | Surat |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02708 |
In context
155 applications in Surat since January 2022 are in the same category (Mining): 48 approved, 24 filed or under review, and 83 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.7 acres, this one is smaller than 58% of them.
No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.
Where it is
Kantvav, Mangrol, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. Karshanbhai Namalabhai Vasava — under environmental review, 650 m away
- Shri Vasantbhai Chhaganbhai Vasava — environmental approval granted, 700 m away
- Shri Vasantbhai Chhaganbhai Vasava — cleared for impact study, 700 m away
- M/s. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — environmental approval granted, 800 m away
- Shiv Stone Quarry C/o- Kunalbhai Somatbhai Ravaliya — environmental approval granted, 800 m away
- M/S. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — environmental approval granted, 850 m away
- M/S. Shiv Stone Quarry C/o. Kunalbhai Somatbhai Ravaliya (Production Expansion) — lapsed, 850 m away
- Shiv Stone Quarry C/o- Kunalbhai Somatbhai Ravaliya — environmental approval granted, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.