Quick answers
What is this project?
Shri Udaysinh Jaydevsinh Gohil Re-appraisal Area-2.53.46 Survey no.- 30 Ne Lagu Kalubhar River Govt. Ltd. Village – Rajsthali, Taluka-Vallabhipur, Dist-Bhavnagar (Gujarat) is a rejected mining project in Rajthali, Vallabhipur, Bhavnagar, Gujarat. The site covers 6.3 acres.
Who is building it?
The applicant is Gohil Udaysinh.
Has it been approved?
No. The application was rejected on 2 Apr 2025.
Where is it?
In Rajthali, Vallabhipur, Bhavnagar, Gujarat.
How big is it?
It has a stated cost of ₹50 lakh and a site of 6.3 acres.
When was it filed?
The application was filed on 28 Sept 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 2 Apr 2025 |
| Application filed | 28 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Gohil Udaysinh |
| Land area | 6.3 acres (2.5 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Rajthali |
| Taluk / tehsil | Vallabhipur |
| District | Bhavnagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02884 |
In context
129 applications in Bhavnagar since January 2022 are in the same category (Mining): 72 approved, 15 filed or under review, and 42 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 6.3 acres, this one is larger than 67% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 8.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Rajthali, Vallabhipur, Bhavnagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shri Yuvrajsinh Pravinsinh Gohil — not approved, 250 m away
- 125mm Dia PE Gas Pipeline for DCS Set up at Umarala to Develop city gas… — forest land use approved, 2.1 km away
- Shri Italiya Vallabhabhai G. Re-appraisal Area-3.90.40 Survey no.- 212. 217&… — not approved, 3 km away
- Shri Jayrajsinh Karansinh Gohil Re-appraisal Area- 2.00.00 Survey no. -… — lapsed, 3.7 km away
- 125 mm DIA PE Pipeline for Extension of PE Pipeline For Vallabhipur CA from… — lapsed, 6.3 km away
- Proposed expansion of metallurgical unit by M/s. Sai Infinium Limited — under environmental review, 12.9 km away
- Proposed expansion of metallurgical unit by M/s. Sai Infinium Limited — lapsed, 12.9 km away
- Proposed expansion of M.S. Ingots/Billets, M.S. Rolling Products (CTD Bars,… — lapsed, 12.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.