What is Developing? Open the mapMap

LapsedMining · Porbandar, Gujarat

Adityana Chalk Mining Project, Survey No. 262(P), 263,264,265, 319/2, 322,323, 492 paiky, Proposed by M/s Porbandar Industrial Products

Adityana Chalk Mining Project, Survey No. 262(P), 263,264,265, 319/2, 322,323, 492 paiky, Proposed by M/s Porbandar Industrial Products is a lapsed mining project in Adityana (Ct), Ranavav, Porbandar, Gujarat. The site covers 123 acres. Its stated project cost is ₹5.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Porbandar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Adityana Chalk Mining Project, Survey No. 262(P), 263,264,265, 319/2, 322,323, 492 paiky, Proposed by M/s Porbandar Industrial Products is a lapsed mining project in Adityana (Ct), Ranavav, Porbandar, Gujarat. The site covers 123 acres.

Who is building it?

The applicant is M H Wadia.

Has it been approved?

No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.

Where is it?

In Adityana (Ct), Ranavav, Porbandar, Gujarat.

How big is it?

It has a stated cost of ₹5.7 crore and a site of 123 acres.

When was it filed?

The application was filed on 1 Apr 2024.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed1 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantM H Wadia
Land area123 acres (49.8 ha)
Project cost₹5.7 crore
Village / localityAdityana (Ct)
Taluk / tehsilRanavav
DistrictPorbandar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-02935

In context

144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 123 acres, this one is larger than 99% of them.

1 other mining lease has applied within 500 m of this site; together with this one they cover 127 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 20 mining leases have applied within 5 km.

Where it is

Adityana (Ct), Ranavav, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.