Quick answers
What is this project?
Adityana Chalk Mining Project, Survey No. 495 proposed by M/s Kiran Enterprise is a lapsed mining project in Adityana (Ct), Ranavav, Porbandar, Gujarat. The site covers 8.9 acres.
Who is building it?
The applicant is Kiran Enterprises.
Has it been approved?
No. The application was lapsed on 29 Oct 2024, so it is no longer under consideration.
Where is it?
In Adityana (Ct), Ranavav, Porbandar, Gujarat.
How big is it?
It has a stated cost of ₹1.8 crore and a site of 8.9 acres.
When was it filed?
The application was filed on 19 Apr 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 19 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Kiran Enterprises |
| Land area | 8.9 acres (3.6 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Adityana (Ct) |
| Taluk / tehsil | Ranavav |
| District | Porbandar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06736 |
In context
144 applications in Porbandar since January 2022 are in the same category (Mining): 53 approved, 21 filed or under review, and 70 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 8.9 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 20 have applied within 5 km.
Where it is
Adityana (Ct), Ranavav, Porbandar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Adityana Chalk Mining Project, Survey No. 262(P), 263,264,265, 319/2, 322,323,… — lapsed, 550 m away
- Adityana Chalk Mining Project, Survey No 267/1/3, Proposed by K.K Enterprise.… — lapsed, 800 m away
- Adityana Chalk Mining Project, Survey No. 292 & 293, proposed by M/s Vasudev… — lapsed, 950 m away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Kolikhada-Ranavav… — lapsed, 1 km away
- Adityana Chalk Mining Project, Survey No 251/2, Proposed by Champaklal Meghji… — lapsed, 1.1 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Kolikhada-Ranavav… — lapsed, 1.6 km away
- Adityana Chalk Mining Project, Survey No. 199/1, 205,206, Proposed by M/s… — lapsed, 1.7 km away
- Adityana Chalk Mining Project, Survey No. 194 (P), Proposed by Shri Dayalal… — lapsed, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.