Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 May 2025 |
| Application filed | 5 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shiv Shaligram Buildcon |
| Use | Mixed use |
| Units | 211 |
| Towers | 2 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 45 m |
| Parking spaces | 229 |
| Land area | 3,900 m² |
| Built-up area | 30,196 m² (3,25,027 sq ft) |
| Plot area | 3,858 m² (41,527 sq ft) |
| Project cost | ₹72.2 crore |
| Village / locality | Chandlodiya |
| Taluk / tehsil | Sabarmati |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-02942 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Other filed 9 Jun 2025 | Lapsed | 1 acre | ₹72.2 crore |
| New project filed 5 Aug 2024 (this page) | Environmental approval granted | 1 acre | ₹72.2 crore |
What the filings say
Shiv Shaligram Buildcon is developing a residential and commercial project named Shiv Shaligram Celestial in the Chandlodiya area of Ahmadabad. The applicant's project report and master plan describe a development comprising two main building blocks on a plot of 0.39 hectares (0.96 acres).
What is planned
The project consists of two buildings, identified as Block A and Block B+C. Both structures are designed with two basements, a ground floor or hollow plinth, and 14 upper floors. The maximum height of the buildings is set at 44.93 metres.
The development will provide a total of 211 units, consisting of:
- 193 residential apartments
- 18 commercial shops
Residential units are categorized by size, with 86 units between 50 and 66 square metres, and 107 units between 66 and 90 square metres. The commercial component is located on the ground and first floors of Block A.
Layout and design
The master plan specifies a total built-up area of 30,195.93 square metres. Block A has a floor area of 544.12 square metres per floor, while Block B+C has 521.74 square metres per floor.
Internal circulation is managed through 6-metre wide roads and a peripheral margin of 6 metres. The project includes separate entry and exit points on the approach road. Vertical movement is provided by seven lifts in total, including three fire lifts (one in Block A and two in Block B+C).
Land and surroundings
The project is situated on Final Plot No. 92/2 (Town Planning Scheme No. 45) in Chandlodiya. The site is bordered by a 24-metre wide Town Planning (TP) road. The applicant has committed to a green belt area of 580.15 square metres, which includes 194 square metres of tree-covered area. A total of 97 trees of indigenous species are to be planted, with a requirement that they be at least 7 feet in height.
Water, power and access
During the operation phase, the total water requirement is estimated at 98.8 kilolitres per day (KLD). Fresh water of 64.3 KLD will be sourced from the Ahmedabad Municipal Corporation (AMC), while the remaining 34.5 KLD will be met through treated sewage. A dual plumbing system will be installed to separate fresh water for domestic use from recycled water used for flushing and gardening.
Power will be supplied by the local grid, supplemented by a 125 KVA diesel generator (DG) set for backup. Energy conservation measures include the installation of 60.76 KW solar power generation and the use of LED lighting for common areas.
Parking is planned across two basement levels, the hollow plinth, and open areas, providing a total of 7,276.07 square metres (229 Equivalent Car Spaces). The basements are designed with a height greater than 4.5 metres to accommodate future mechanical parking systems.
Environmental safeguards
An onsite Sewage Treatment Plant (STP) will treat approximately 81.5 KLD of sewage. For solid waste, the project will use an onsite Organic Waste Convertor to treat biodegradable waste, while recyclable materials will be sold to vendors. Rainwater harvesting will be managed through one percolation well.
Fire safety provisions include fire extinguishers on each floor, smoke detectors, sprinklers, a 150 KL underground water tank, and 20 KL terrace tanks. The applicant has also allocated ₹1.44 crore for Corporate Environmental Responsibility (CER) activities, including tree plantation and solar street light installation along the adjacent TP road.
| Item | Detail |
|---|---|
| Total Built-up Area | 30,195.93 sq. m. |
| Residential Units | 193 |
| Commercial Units | 18 |
| Max Building Height | 44.93 m |
| Parking Capacity | 229 CPS |
| Solar Power Generation | 60.76 KW |
| STP Capacity | 81.5 KLD |
| Green Belt Trees | 97 |
| CER Budget | ₹1.44 crore |
Shiv Shaligram Celestial site plan and layout
A drawing from the project's filings. Sign in free to see it.
🔒 Sign in free to see itIn context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 86% of them.
240 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandlodiya, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shiv Shaligram Celestial — lapsed, 0 m away
- The Olive — more information requested, 450 m away
- The Olive — environmental approval granted, 450 m away
- The Olive — environmental approval granted, 450 m away
- Commercial (Merchentile-1) and Residential (Dwelling-3) building construction… — more information requested, 550 m away
- Shantam Parmeshwar — environmental approval granted, 750 m away
- Shantam Parmeshwar — environmental approval granted, 750 m away
- Saral Paradise — lapsed, 850 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.