Shiv Shaligram Celestial is a lapsed building project in Chandlodiya, Sabarmati, Ahmadabad, Gujarat. The site covers 1 acre. Its stated project cost is ₹72.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 2 Nov 2025).

See it on the live map All projects in Ahmadabad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Shiv Shaligram Celestial

Project details

StatusLapsed
Status since2 Nov 2025
Application filed9 Jun 2025
Approval soughtEnvironmental approval
Application typeOther
SectorBuildings & townships
ApplicantShiv Shaligram Buildcon
Land area3,900 m²
Project cost₹72.2 crore
Village / localityChandlodiya
Taluk / tehsilSabarmati
DistrictAhmadabad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-08846

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Other filed 9 Jun 2025 (this page)Lapsed1 acre₹72.2 crore
New project filed 5 Aug 2024Environmental approval granted1 acre₹72.2 crore

What the filings say

Shiv Shaligram Buildcon is developing a residential and commercial project named Shiv Shaligram Celestial in the Chandlodiya area of Ahmadabad. The applicant's project report and master plan describe a development comprising two main building blocks on a plot of 0.39 hectares (0.96 acres).

What is planned

The project consists of two buildings, identified as Block A and Block B+C. Both structures are designed with two basements, a ground floor or hollow plinth, and 14 upper floors. The maximum height of the buildings is set at 44.93 metres.

The development will provide a total of 211 units, consisting of:

Residential units are categorized by size, with 86 units between 50 and 66 square metres, and 107 units between 66 and 90 square metres. The commercial component is located on the ground and first floors of Block A.

Layout and design

The master plan specifies a total built-up area of 30,195.93 square metres. Block A has a floor area of 544.12 square metres per floor, while Block B+C has 521.74 square metres per floor.

Internal circulation is managed through 6-metre wide roads and a peripheral margin of 6 metres. The project includes separate entry and exit points on the approach road. Vertical movement is provided by seven lifts in total, including three fire lifts (one in Block A and two in Block B+C).

Land and surroundings

The project is situated on Final Plot No. 92/2 (Town Planning Scheme No. 45) in Chandlodiya. The site is bordered by a 24-metre wide Town Planning (TP) road. The applicant has committed to a green belt area of 580.15 square metres, which includes 194 square metres of tree-covered area. A total of 97 trees of indigenous species are to be planted, with a requirement that they be at least 7 feet in height.

Water, power and access

During the operation phase, the total water requirement is estimated at 98.8 kilolitres per day (KLD). Fresh water of 64.3 KLD will be sourced from the Ahmedabad Municipal Corporation (AMC), while the remaining 34.5 KLD will be met through treated sewage. A dual plumbing system will be installed to separate fresh water for domestic use from recycled water used for flushing and gardening.

Power will be supplied by the local grid, supplemented by a 125 KVA diesel generator (DG) set for backup. Energy conservation measures include the installation of 60.76 KW solar power generation and the use of LED lighting for common areas.

Parking is planned across two basement levels, the hollow plinth, and open areas, providing a total of 7,276.07 square metres (229 Equivalent Car Spaces). The basements are designed with a height greater than 4.5 metres to accommodate future mechanical parking systems.

Environmental safeguards

An onsite Sewage Treatment Plant (STP) will treat approximately 81.5 KLD of sewage. For solid waste, the project will use an onsite Organic Waste Convertor to treat biodegradable waste, while recyclable materials will be sold to vendors. Rainwater harvesting will be managed through one percolation well.

Fire safety provisions include fire extinguishers on each floor, smoke detectors, sprinklers, a 150 KL underground water tank, and 20 KL terrace tanks. The applicant has also allocated ₹1.44 crore for Corporate Environmental Responsibility (CER) activities, including tree plantation and solar street light installation along the adjacent TP road.

ItemDetail
Total Built-up Area30,195.93 sq. m.
Residential Units193
Commercial Units18
Max Building Height44.93 m
Parking Capacity229 CPS
Solar Power Generation60.76 KW
STP Capacity81.5 KLD
Green Belt Trees97
CER Budget₹1.44 crore

Shiv Shaligram Celestial site plan and layout

A drawing from the project's filings. Sign in free to see it.

Shiv Shaligram Celestial: Site layout: building blocks, margins, roads and parking areas (preview)🔒 Sign in free to see it
Site layout: building blocks, margins, roads and parking areas

In context

1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 86% of them.

240 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chandlodiya, Sabarmati, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.