What is Developing? Open the mapMap

Cleared for impact studyIndustry · Bharuch, Gujarat

Proposed Expansion Project of Synthetic Organic Chemicals Manufacturing By M/s. FARMSON PHARMACEUTICALS GUJARAT PVT. LTD. (UNIT-V) Located at Plot No. DP-146, DP-148, DP-149 & DP-47 Saykha Industrial Estate, Saykha, Dist: Bharuch, Gujarat-392140.

Proposed Expansion Project of Synthetic Organic Chemicals Manufacturing By M/s. FARMSON PHARMACEUTICALS GUJARAT PVT. LTD. (UNIT-V) Located at Plot No. DP-146, DP-148, DP-149 & DP-47 Saykha Industrial Estate, Saykha, Dist: Bharuch, Gujarat-392140 is a proposed industrial project in Sayakha, Vagra, Bharuch, Gujarat. The site covers 12.9 acres. Its stated project cost is ₹494 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 24 Jul 2024).

See it on the live map All projects in Bharuch

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion Project of Synthetic Organic Chemicals Manufacturing By M/s. FARMSON…

Project details

StatusCleared for impact study
Status since24 Jul 2024
Application filed3 Jul 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantFarmson Pharmaceutical Gujarat Private Limited
Land area12.9 acres (5.2 ha)
Project cost₹494 crore
Village / localitySayakha
Taluk / tehsilVagra
DistrictBharuch
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-03218

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Ownership transfer filed 30 Sept 2025Environmental approval granted12.9 acres₹494 crore
Expansion filed 9 Dec 2024Environmental approval granted12.9 acres₹494 crore
Early planning filed 3 Jul 2024 (this page)Cleared for impact study12.9 acres₹494 crore

In context

1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.9 acres, this one is larger than 71% of them.

313 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sayakha, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Close to ONGC Plans 78 Oil and Gas Wells in Bharuch, Gujarat (5.7 km away).

Other projects nearby

More from Farmson Pharmaceutical Gujarat Private Limited in Bharuch

4 Farmson Pharmaceutical Gujarat projects in Bharuch
All 12 Farmson Pharmaceutical Gujarat projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.