Quick answers
What is Sai Sharnam?
Sai Sharnam is an approved residential project in Chiloda, Gandhinagar, Gujarat. It plans 157 units in 5 towers of up to 7 floors on 1.6 acres.
Who is building it?
The applicant is Shiv Infracon.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Jan 2025), as of 27 Nov 2026.
Where is it?
In Chiloda, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹39.2 crore and a site of 1.6 acres.
When was it filed?
The application was filed on 1 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Jan 2025 |
| Application filed | 1 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Shiv Infracon |
| Use | Residential |
| Units | 157 |
| Towers | 5 |
| Floors (tallest) | 7 |
| Basements | 1 |
| Height | 24 m |
| Parking spaces | 242 |
| Land area | 1.6 acres (0.7 ha) |
| Built-up area | 6,542 m² (70,417 sq ft) |
| Plot area | 6,542 m² (70,417 sq ft) |
| Project cost | ₹39.2 crore |
| Village / locality | Chiloda |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03294 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 1 Aug 2024 (this page) | Environmental approval granted | 1.6 acres | ₹39.2 crore |
| New project filed 29 Jul 2024 | Withdrawn | 1.6 acres | ₹39 lakh |
What the filings say
Shiv Infracon proposes to develop Sai Sharnam, a mixed-use residential and commercial project in Chiloda, Gandhinagar. The project is planned on a plot area of 6,542 square metres (1.61 acres) and will feature a total built-up area of 23,990.67 square metres.
What is planned
The development consists of five blocks (Blocks A to E) designed for residential and commercial use. The residential component includes 132 units, while the commercial section comprises 25 shops. The buildings are designed as earthquake-resistant structures according to relevant Indian Standard codes.
According to the applicant's area statement, the project includes:
- Residential Units: 132 units (comprising 28 units of 2 BHK, 76 units of 3 BHK, and 28 units of 4 BHK).
- Commercial Units: 25 shops located on the ground floor.
- Built-up Area: 23,990.67 square metres.
- FSI Area: 14,507.55 square metres.
- Society Facilities: A society office and a community hall are planned within the hollow plinth area.
Layout and design
The layout plan shows five distinct blocks arranged around a central internal road system. Blocks A and B are positioned towards the front, facing a 24-metre wide Town Planning (TP) road. The ground floor of Block A features 13 shops, while Block B contains the remaining commercial units. Internal roads with widths of 7.50 metres and 13.25 metres provide access to the rear blocks (C, D, and E).
Parking is distributed across the basement and hollow plinth levels. The project provides a total parking area of 5,559.27 square metres, accommodating 181 Car Parking Spaces (CPS). This includes 124 spaces in the basement and 57 spaces in the hollow plinth.
Land and surroundings
The project site is located at Final Plot No. 36/2 and 65/2 in TP Scheme No. 17 (Mota Chiloda). The land is currently open and undeveloped. The surrounding area is within the Gandhinagar Municipal Corporation (GMC) limits and is already developed with schools, hospitals, and places of worship. The Ahmedabad Airport is approximately 19.45 km away, and the Gandhinagar railway station is about 10.6 km from the site.
Water, power and access
During the operational phase, the total water requirement is estimated at 139 kilolitres per day (KLD). Fresh water (88 KLD) will be sourced from the Gandhinagar Municipal Corporation (GMC) or Narmada water supply. The project will generate 122 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP). Treated water (51 KLD) will be reused for flushing and gardening, with the remaining 71 KLD discharged into the GMC drainage network.
Power will be supplied by Uttar Gujarat Vij Company Limited (UGVCL). The estimated demand is 25 kW during construction and 2 MW during operation. A Diesel Generator (DG) set is planned for emergency backup.
Environmental safeguards
The applicant plans to develop a greenbelt area of 834.4 square metres, consisting of 180.2 square metres of tree cover and 654.2 square metres of lawn. For rainwater management, percolation wells will be installed to recharge ground aquifers.
Solid waste management involves segregating dry and wet waste at the source. The project will generate approximately 426 kg of municipal waste per day. Wet waste (234 kg/day) will be processed in an organic waste converter to produce compost for the greenbelt, while dry waste (192 kg/day) will be collected by the GMC. Energy conservation measures include the use of LED lighting for common areas, solar street lights, and non-reflective glass to minimize the heat island effect.
Sai Sharnam site plan and layout
3 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is larger than 59% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiloda, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sai Sharnam — withdrawn, 0 m away
- Setu Stellar — environmental approval granted, 150 m away
- Diversion of 0.183 Ha. of Protected Forest Land for Parallel/Cross Laying of… — forest land use approved, 800 m away
- "jeet Skyway" — environmental approval granted, 850 m away
- Proposed Onshore Drilling of 16 Nos. of Development Wells and Appraisal of 13… — returned to applicant, 2 km away
- Proposed Onshore Drilling of 16 Nos. of Development Wells and Appraisal of 13… — returned to applicant, 2 km away
- Proposed Onshore Drilling of 16 Nos. of Development Wells and Appraisal of 13… — cleared for impact study, 2 km away
- Proposed Onshore Drilling of 16 Nos. of Development Wells and Appraisal of 13… — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.