What is Developing? Open the mapMap

WithdrawnBuildings & townships · Gandhinagar, Gujarat

Sai Sharnam

Sai Sharnam is a withdrawn building project in Chiloda, Gandhinagar, Gujarat. The site covers 1.6 acres. Its stated project cost is ₹39 lakh. As of 27 Nov 2026, its status is “Withdrawn” (since 21 May 2025).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Sai Sharnam?

Sai Sharnam is a withdrawn building project in Chiloda, Gandhinagar, Gujarat. The site covers 1.6 acres.

Who is building it?

The applicant is Shiv Infracon.

Has it been approved?

No. The application was withdrawn on 21 May 2025, so it is no longer under consideration.

Where is it?

In Chiloda, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹39 lakh and a site of 1.6 acres.

When was it filed?

The application was filed on 29 Jul 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Sai Sharnam

Project details

StatusWithdrawn
Status since21 May 2025
Application filed29 Jul 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantShiv Infracon
UseOther
Land area1.6 acres (0.7 ha)
Project cost₹39 lakh
Village / localityChiloda
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06090

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 1 Aug 2024Environmental approval granted1.6 acres₹39.2 crore
New project filed 29 Jul 2024 (this page)Withdrawn1.6 acres₹39 lakh

What the filings say

Shiv Infracon proposes to develop Sai Sharnam, a mixed-use residential and commercial project in Chiloda, Gandhinagar. The project is planned on a plot area of 6,542 square metres (1.61 acres) and will feature a total built-up area of 23,990.67 square metres.

What is planned

The development consists of five blocks (Blocks A to E) designed for residential and commercial use. The residential component includes 132 units, while the commercial section comprises 25 shops. The buildings are designed as earthquake-resistant structures according to relevant Indian Standard codes.

According to the applicant's area statement, the project includes:

Layout and design

The layout plan shows five distinct blocks arranged around a central internal road system. Blocks A and B are positioned towards the front, facing a 24-metre wide Town Planning (TP) road. The ground floor of Block A features 13 shops, while Block B contains the remaining commercial units. Internal roads with widths of 7.50 metres and 13.25 metres provide access to the rear blocks (C, D, and E).

Parking is distributed across the basement and hollow plinth levels. The project provides a total parking area of 5,559.27 square metres, accommodating 181 Car Parking Spaces (CPS). This includes 124 spaces in the basement and 57 spaces in the hollow plinth.

Land and surroundings

The project site is located at Final Plot No. 36/2 and 65/2 in TP Scheme No. 17 (Mota Chiloda). The land is currently open and undeveloped. The surrounding area is within the Gandhinagar Municipal Corporation (GMC) limits and is already developed with schools, hospitals, and places of worship. The Ahmedabad Airport is approximately 19.45 km away, and the Gandhinagar railway station is about 10.6 km from the site.

Water, power and access

During the operational phase, the total water requirement is estimated at 139 kilolitres per day (KLD). Fresh water (88 KLD) will be sourced from the Gandhinagar Municipal Corporation (GMC) or Narmada water supply. The project will generate 122 KLD of sewage, which will be treated in an on-site Sewage Treatment Plant (STP). Treated water (51 KLD) will be reused for flushing and gardening, with the remaining 71 KLD discharged into the GMC drainage network.

Power will be supplied by Uttar Gujarat Vij Company Limited (UGVCL). The estimated demand is 25 kW during construction and 2 MW during operation. A Diesel Generator (DG) set is planned for emergency backup.

Environmental safeguards

The applicant plans to develop a greenbelt area of 834.4 square metres, consisting of 180.2 square metres of tree cover and 654.2 square metres of lawn. For rainwater management, percolation wells will be installed to recharge ground aquifers.

Solid waste management involves segregating dry and wet waste at the source. The project will generate approximately 426 kg of municipal waste per day. Wet waste (234 kg/day) will be processed in an organic waste converter to produce compost for the greenbelt, while dry waste (192 kg/day) will be collected by the GMC. Energy conservation measures include the use of LED lighting for common areas, solar street lights, and non-reflective glass to minimize the heat island effect.

Sai Sharnam site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Sai Sharnam: Layout plan: blocks, internal roads, and shop locations (preview)🔒 Sign in free to see it
Layout plan: blocks, internal roads, and shop locations
Sai Sharnam: Location map: project site in Mota Chiloda (preview)🔒 Sign in free to see it
Location map: project site in Mota Chiloda
Sai Sharnam: Technical drawing: structure of percolation well (preview)🔒 Sign in free to see it
Technical drawing: structure of percolation well

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.6 acres, this one is larger than 59% of them.

17 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chiloda, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.