One of 2 filings for this project. The project's main page, with every filing and where each stands: Industrial project by Krifour Industries PVT. LTD.
Project details
| Status | Lapsed |
|---|---|
| Status since | 29 Oct 2024 |
| Application filed | 13 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Industry |
| Applicant | Krifour Industries Private Limited |
| Land area | 17.9 acres (7.2 ha) |
| Project cost | ₹54.3 crore |
| Village / locality | Alva |
| Taluk / tehsil | Hansot |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-03481 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 11 Jul 2024 | Environmental approval granted | 17.9 acres | ₹54.3 crore |
| Ownership transfer filed 13 Jun 2024 (this page) | Lapsed | 17.9 acres | ₹54.3 crore |
In context
1,278 applications in Bharuch since January 2022 are in the same category (Industry): 817 approved, 338 filed or under review, and 123 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.9 acres, this one is larger than 76% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alva, Hansot, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Krifour Industries PVT. LTD. — environmental approval granted, 0 m away
- J. S. Enterprise — cleared for impact study, 1.6 km away
- Permission for laying proposed 66KV, (1 C) 630 Sq. mm (3+1) Corrugated Power… — more information requested, 2.9 km away
- Solar Park by installation of Ground Mounted Solar Panels — forest land use approved, 4.2 km away
- Permission for laying 11 KV - three (3-Nos.) Transmission Power Cable Line on… — lapsed, 4.2 km away
- To set up Solar Park — forest land use approved, 5.1 km away
- Industrial project by M/s. Shaktichem Private Limited — lapsed, 6.4 km away
- Permission for providing Approach Road from the road-side shoulder of SH-6… — forest land use approved, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.