Project details
| Official title | Development of Solar Park by installation of Ground Mounted Solar Panels in Hansot Village, Taluka Hansot, Dist: Bharuch |
|---|---|
| Status | Forest land use approved |
| Status since | 11 Oct 2024 |
| Application filed | 26 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Kpi Green Energy Limited |
| Land area | 100 m² |
| Forest land | 110 m² |
| Project cost | ₹4 lakh |
| Village / locality | Hansot |
| Taluk / tehsil | Hansot |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14333 |
In context
58 applications in Bharuch since January 2022 are in the same category (Buildings & townships): 34 approved, 12 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 0 acres, this one is smaller than 100% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hansot, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Permission for laying 11 KV - three (3-Nos.) Transmission Power Cable Line on… — lapsed, 0 m away
- Permission for laying proposed 66KV, (1 C) 630 Sq. mm (3+1) Corrugated Power… — more information requested, 1.3 km away
- To set up Solar Park — forest land use approved, 1.6 km away
- Industrial project by Krifour Industries PVT. LTD. — environmental approval granted, 4.2 km away
- Industrial project by Krifour Industries PVT. LTD. — lapsed, 4.2 km away
- Permission for providing Approach Road from the road-side shoulder of SH-6… — forest land use approved, 4.5 km away
- J. S. Enterprise — cleared for impact study, 5.8 km away
- Permission for laying proposed 8" Ø Steel Gas pipeline by GAIL — forest land use approved, 6.1 km away
More from Kpi Green Energy Limited in Bharuch
- Solar Park - Diversion Area 0.0030 Ha. Laying 33KV 4-Nos electric cable line… — more information requested
- FCA proposal - Diversion of Protected Forest Area 0.0956 Ha solar power… — in-principle approval, conditions pending
- Fca Proposal Permission for Diversion of Protected Forest Bare Minimum Area… — forest land use approved
- Request Protected Forest permission for area 0.0028 Ha. KPI Solar Park… — forest land use approved
- Diversion of Protected Forest area 0.2764 Ha Laying transmission power line… — forest land use approved
- Diversion of Forest Area – 0.0840 Ha. Permission for laying 33 KV 5-nos.… — forest land use approved
26 Kpi Green Energy projects in Bharuch
All 37 Kpi Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.