Environmental approval grantedMining · Botad, Gujarat

Proposed for M/S Shri Dilipbhai Kanubhai Basiya, Black Trap Quarry Land area (Survey No. 129 Paiki & Padavadar Black trap Block-A) measuring 4.00 Ha

Proposed for M/S Shri Dilipbhai Kanubhai Basiya, Black Trap Quarry Land area (Survey No. 129 Paiki & Padavadar Black trap Block-A) measuring 4.00 Ha is an approved mining project in Padvadar, Gadhada, Botad, Gujarat. The site covers 9.9 acres. Its stated project cost is ₹27.8 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Feb 2025).

See it on the live map All projects in Botad

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed for M/S Shri Dilipbhai Kanubhai Basiya, Black Trap Quarry Land area (Survey No. 129 Paiki & Padavadar Black trap Block-A) measuring 4.00 Ha is an approved mining project in Padvadar, Gadhada, Botad, Gujarat. The site covers 9.9 acres.

Who is building it?

The applicant is Shri Dilipbhai Kanubhai Basiya.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Feb 2025), as of 27 Nov 2026.

Where is it?

In Padvadar, Gadhada, Botad, Gujarat.

How big is it?

It has a stated cost of ₹27.8 crore and a site of 9.9 acres.

When was it filed?

The application was filed on 16 Aug 2024.

Project details

Official titleProposed for M/S Shri Dilipbhai Kanubhai Basiya, Black Trap Quarry Land area (Survey No. 129 Paiki & Padavadar Black trap Block-A) measuring 4.00 Ha, located in village- Padavadar, Taluka Gadhada, District-Botad (Gujarat)
StatusEnvironmental approval granted
Status since13 Feb 2025
Application filed16 Aug 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantShri Dilipbhai Kanubhai Basiya
Land area9.9 acres (4 ha)
Project cost₹27.8 crore
Village / localityPadvadar
Taluk / tehsilGadhada
DistrictBotad
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-03756

In context

58 applications in Botad since January 2022 are in the same category (Mining): 24 approved, 22 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 9.9 acres, this one is larger than 91% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Padvadar, Gadhada, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.