Quick answers
What is this project?
This proposed mining project by M/s Shiv Shakti Suppliers & Enterprises , Padvadar Blacktrap Block-B for an area 03.00.00Hect. at Survey No. 129 Paiki to Village – Padvadar, Taluka – Gadhada, District– Botad, State – Gujarat is in Padvadar, Gadhada, Botad, Gujarat. The site covers 7.4 acres.
Who is building it?
The applicant is Yogendrasinh Zala.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Padvadar, Gadhada, Botad, Gujarat.
How big is it?
It has a stated cost of ₹1.4 crore and a site of 7.4 acres.
When was it filed?
The application was filed on 28 Apr 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 7 Nov 2026 |
| Application filed | 28 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Yogendrasinh Zala |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹1.4 crore |
| Village / locality | Padvadar |
| Taluk / tehsil | Gadhada |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-10423 |
In context
58 applications in Botad since January 2022 are in the same category (Mining): 24 approved, 22 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 7.4 acres, this one is larger than 86% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Padvadar, Gadhada, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed for M/S Shri Dilipbhai Kanubhai Basiya, Black Trap Quarry Land area… — environmental approval granted, 600 m away
- Diversion of 0.3480 Hectare of Reserve Forest Land Declared As Reserve Forest… — lapsed, 2.1 km away
- Design, Construction and O & M of Water Treatment Plant of 468.75 M3/Hr.… — forest land use approved, 2.1 km away
- Construction of 2 Lane Major Bridge at Near Village Patna, Malpara and Gordka… — under forest review, 4.4 km away
- Shri Rajeshbhai Ranchhodbhai Makasana (Mandavdhar Ordinary sand Block - B) — under environmental review, 8 km away
- Shri Rajeshbhai Ranchhodbhai Makasana — returned to applicant, 8 km away
- Shri Ranjitsinh B Zala (Mandavdhar Ordinary sand Block- C) — under environmental review, 8 km away
- Shri Ranjitsinh B Zala — returned to applicant, 8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.