WithdrawnIndustry · Kachchh, Gujarat

Proposed Expansion of Clinker Plant Capacity (7.5 Million TPA to 17.5 Million TPA) & Cement Plant Capacity (8.6 Million TPA to 18.6 Million TPA) by M/s. Sanghi Industries Limited.

Proposed Expansion of Clinker Plant Capacity (7.5 Million TPA to 17.5 Million TPA) & Cement Plant Capacity (8.6 Million TPA to 18.6 Million TPA) by M/s. Sanghi Industries Limited is a withdrawn industrial project in Ber Moti, Abdasa, Kachchh, Gujarat. The site covers 353.8 acres. Its stated project cost is ₹8,776.8 crore. As of 27 Nov 2026, its status is “Withdrawn” (since 29 Apr 2024).

See it on the live map All projects in Kachchh

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion of Clinker Plant Capacity (7.5 Million TPA to 17.5 Million TPA) & Cement Plant Capacity (8.6 Million TPA to 18.6 Million TPA) by M/s. Sanghi Industries Limited is a withdrawn industrial project in Ber Moti, Abdasa, Kachchh, Gujarat. The site covers 353.8 acres.

Who is building it?

The applicant is Gaurang Bhatt.

Has it been approved?

No. The application was withdrawn on 29 Apr 2024, so it is no longer under consideration.

Where is it?

In Ber Moti, Abdasa, Kachchh, Gujarat.

How big is it?

It has a stated cost of ₹8,776.8 crore and a site of 353.8 acres.

When was it filed?

The application was filed on 20 Apr 2024.

Project details

StatusWithdrawn
Status since29 Apr 2024
Application filed20 Apr 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantGaurang Bhatt
Land area353.8 acres (143.2 ha)
Project cost₹8,776.8 crore
Village / localityBer Moti
Taluk / tehsilAbdasa
DistrictKachchh
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04042

In context

160 applications in Kachchh since January 2022 are in the same category (Industry): 104 approved, 40 filed or under review, and 16 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 353.8 acres, this one is larger than 83% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Ber Moti, Abdasa, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.