Quick answers
What is Ghanshyambhai Karshanbhai Gohil?
Ghanshyambhai Karshanbhai Gohil is an approved mining project in Vrajpar, Dhrangadhra, Surendranagar, Gujarat. The site covers 2.5 acres.
Who is building it?
The applicant is Ganshyambhai K Gohil.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Jan 2025), as of 27 Nov 2026.
Where is it?
In Vrajpar, Dhrangadhra, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹3.5 crore and a site of 2.5 acres.
When was it filed?
The application was filed on 8 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Jan 2025 |
| Application filed | 8 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ganshyambhai K Gohil |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Vrajpar |
| Taluk / tehsil | Dhrangadhra |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04047 |
In context
271 applications in Surendranagar since January 2022 are in the same category (Mining): 107 approved, 59 filed or under review, and 105 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 2.5 acres, this one is smaller than 97% of them.
No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.
Where it is
Vrajpar, Dhrangadhra, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Re-Appraisal of EC Granted from DEIAA Surendranagar To SEIAA Gujarat Navalgadh… — not approved, 3 km away
- Re-Appraisal of EC Granted from DEIAA Surendranagar To SEIAA Gujarat Navalgadh… — not approved, 3 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — environmental approval granted, 5.5 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 5.5 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — withdrawn, 5.7 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 5.7 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — environmental approval granted, 5.8 km away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 5.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.