Quick answers
What is this project?
Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing Plant of M/s. Q Mor India Pvt. Ltd is a proposed industrial project in Haripur, Dhrangadhra, Surendranagar, Gujarat. The site covers 2.7 acres.
Who is building it?
The applicant is Q Mor India Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 14 Sept 2024), as of 27 Nov 2026.
Where is it?
In Haripur, Dhrangadhra, Surendranagar, Gujarat.
How big is it?
It has a stated cost of ₹16 crore and a site of 2.7 acres.
When was it filed?
The application was filed on 11 Jul 2024.
One of 4 filings for this project. The project's main page, with every filing and where each stands: Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing Plant of…
Project details
| Official title | Establishment of Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing Plant of M/s. Q Mor India Pvt. Ltd. |
|---|---|
| Status | Cleared for impact study |
| Status since | 14 Sept 2024 |
| Application filed | 11 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Q Mor India Private Limited |
| Land area | 2.7 acres (1.1 ha) |
| Project cost | ₹16 crore |
| Village / locality | Haripur |
| Taluk / tehsil | Dhrangadhra |
| District | Surendranagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04666 |
All filings for this project
This project has 4 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 20 Jan 2025 | Environmental approval granted | 2.7 acres | ₹16 crore |
| Amendment filed 16 Jan 2025 | Withdrawn | 1.6 acres | ₹15.7 crore |
| Amendment filed 11 Jul 2024 (this page) | Cleared for impact study | 2.7 acres | ₹16 crore |
| Early planning filed 12 Feb 2024 | Cleared for impact study | 1.6 acres | ₹15.7 crore |
In context
22 applications in Surendranagar since January 2022 are in the same category (Industry): 13 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 38 days from filing to approval. At 2.7 acres, this one is smaller than 64% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haripur, Dhrangadhra, Surendranagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — environmental approval granted, 0 m away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — withdrawn, 0 m away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 0 m away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — environmental approval granted, 250 m away
- Proposed Resin Manufacturing Plant Within the Existing Laminate Manufacturing… — cleared for impact study, 250 m away
- Dhrangadhra Sandstone Mining Project, Survey No. 1379 Paiky 1/ Paiky 2,… — environmental approval granted, 4.3 km away
- Devlopment of "Kabir Aashram" by Kabir Charitable Trust, Ishadra Ta.… — lapsed, 4.9 km away
- Ghanshyambhai Karshanbhai Gohil — environmental approval granted, 5.8 km away
All 4 Q Mor projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.