Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Samay Aura

Samay Aura is an approved residential project in Kudasan, Gandhinagar, Gujarat. It plans 148 units in 3 towers of up to 13 floors on 1.1 acres. Its stated project cost is ₹62 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 17 Mar 2025).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Samay Aura?

Samay Aura is an approved residential project in Kudasan, Gandhinagar, Gujarat. It plans 148 units in 3 towers of up to 13 floors on 1.1 acres.

Who is building it?

The applicant is Tarun Santramdas Varma.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 17 Mar 2025), as of 27 Nov 2026.

Where is it?

In Kudasan, Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹62 crore and a site of 1.1 acres.

When was it filed?

The application was filed on 9 Sept 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Samay Aura

Project details

StatusEnvironmental approval granted
Status since17 Mar 2025
Application filed9 Sept 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantTarun Santramdas Varma
UseResidential
Units148
Towers3
Floors (tallest)13
Basements2
Height45 m
Parking spaces188
Land area1.1 acres (0.4 ha)
Built-up area25,228 m² (2,71,552 sq ft)
Plot area4,294 m² (46,220 sq ft)
Project cost₹62 crore
Village / localityKudasan
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-04107

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 1 Jul 2025Environmental approval granted1.1 acres₹62 crore
New project filed 9 Sept 2024 (this page)Environmental approval granted1.1 acres₹62 crore

What the filings say

What is planned

Samay Aura is a residential expansion project proposed by Tarun Santramdas Varma in Kudasan, Gandhinagar. The applicant's project report states that the development will consist of three residential blocks on a plot area of 4,294.47 square metres (approximately 1.06 acres).

The project configuration includes:

The development will provide a total of 148 residential units, all configured as 3BHK (three-bedroom, hall, and kitchen) apartments. The total built-up area is recorded as 28,740.53 square metres, following a correction to include basement areas that were initially omitted in earlier filings.

Layout and design

The buildings are designed with a maximum height of 44.97 metres. The layout includes a peripheral margin of 7 metres and internal roads with a width of 6 metres to ensure unobstructed movement for emergency vehicles. Separate entry and exit points are planned on the approach road.

Parking is distributed across two basement levels and the hollow plinth area, providing a total of 188 Equivalent Car Spaces (ECS). The applicant has committed to providing electric vehicle charging facilities for 20% of the parking spaces. The basement height is planned to be greater than 4.5 metres to accommodate potential future mechanical parking systems.

Water, power and access

During the operation phase, the total water requirement is estimated at 149 kilolitres per day (KLD). Of this, 97 KLD of fresh water will be sourced from the Gandhinagar Municipal Corporation (GMC), while the remaining 52 KLD will be met through treated sewage for flushing and gardening. A dual plumbing system will be installed to separate fresh and recycled water lines.

Sewage generation is expected to be 131 KLD, which will be treated in an on-site Sewage Treatment Plant (STP) with a capacity of 200 KLD. For power, the project requires approximately 1.50 MW, to be sourced from Uttar Gujarat Vij Company Limited (UGVCL). A 125 KVA diesel generator set is proposed for backup power.

Environmental safeguards

The project includes several energy conservation and waste management measures:

Corporate Environmental Responsibility

The applicant has allocated ₹124 lakh for Corporate Environmental Responsibility (CER) activities to be completed within three years. These include:

ItemDetail
Total Plot Area0.43 hectares (1.06 acres)
Total Built-up Area28,740.53 square metres
Residential Units148 (3BHK)
Total Parking188 ECS (7,079.82 sqm)
STP Capacity200 KLD
Solar Power Generation132.84 KW
Estimated Project Cost₹62 crore

Samay Aura site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Samay Aura: Layout Plan: Three residential blocks, common plot, and internal road network (preview)🔒 Sign in free to see it
Layout Plan: Three residential blocks, common plot, and internal road network
Samay Aura: Key Plan: Project location relative to surrounding roads and landmarks (preview)🔒 Sign in free to see it
Key Plan: Project location relative to surrounding roads and landmarks
Samay Aura: Percolation Well: Design for rainwater harvesting and groundwater recharge (preview)🔒 Sign in free to see it
Percolation Well: Design for rainwater harvesting and groundwater recharge

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 74% of them.

196 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kudasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.