Quick answers
What is Vinayak Sapphire-2?
Vinayak Sapphire-2 is an approved residential project in Kudasan, Gandhinagar, Gujarat. It plans 135 units in 3 towers of up to 14 floors on 1.1 acres.
Who is building it?
The applicant is Vinayak Group.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Apr 2025), as of 27 Nov 2026.
Where is it?
In Kudasan, Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹42.5 crore and a site of 1.1 acres.
When was it filed?
The application was filed on 29 Nov 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Apr 2025 |
| Application filed | 29 Nov 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vinayak Group |
| Use | Residential |
| Units | 135 |
| Towers | 3 |
| Floors (tallest) | 14 |
| Basements | 2 |
| Height | 50 m |
| Parking spaces | 165 |
| Land area | 1.1 acres (0.4 ha) |
| Built-up area | 29,390 m² (3,16,351 sq ft) |
| Plot area | 4,295 m² (46,231 sq ft) |
| Project cost | ₹42.5 crore |
| Village / locality | Kudasan |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04822 |
What the filings say
What is planned
Vinayak Sapphire-2 is a residential and commercial building project proposed by Vinayak Group in Kudasan, Gandhinagar. The applicant's project reports and layout plans describe a development consisting of three main building blocks (Block-A, Block-B, and Block-C) with a maximum height of 14 floors above a hollow plinth and two basement levels.
The project includes a total of 135 residential units. The floor-wise distribution is as follows:
- Block-A and Block-C: Each will contain 54 units (4 units per floor from the 1st to 13th floors, and 2 units on the 14th floor).
- Block-B: Will contain 27 units (2 units per floor from the 1st to 13th floors, and 1 unit on the 14th floor).
Residential units are primarily 3BHK apartments, with penthouse units planned for the 14th floor. The project also includes a dedicated club house building with a ground floor and first floor.
Layout and design
The project is situated on a plot area of 0.43 hectares (1.06 acres). The layout features a central common plot of 462.09 square metres. The three blocks are arranged around internal approach roads, with Block-A at the front near the 12.00-metre wide service road, and Blocks B and C positioned towards the rear of the site.
Building design includes a hollow plinth level for parking and services, followed by 14 residential floors. The 14th floor is designed with lower terraces. A 4.40-metre wide ramp provides access to the two basement levels, which are dedicated to parking and utilities like the Sewage Treatment Plant (STP) and water tanks.
Water, power and access
The applicant plans to meet water requirements through the municipal supply. A 75 kilolitres per day (KLD) STP is planned for the basement to treat domestic wastewater. The project includes two underground water tanks, each with a capacity of 1,05,200 litres, and overhead tanks of 20,000 litres on each block.
Power will be sourced from the local grid, supplemented by a rooftop solar energy installation. The solar plant is proposed to have a 70 KW capacity, requiring approximately 887.88 square metres of terrace space. A diesel generator (DG) set will be provided for emergency backup. Access to the site is provided via a 12.00-metre wide service road that connects to the Koba-Gandhinagar State Highway.
Environmental safeguards
The Environment Management Plan (EMP) outlines several mitigation measures:
- Air and Noise: Water sprinkling and wind barricading will be used during construction to control dust. Acoustic enclosures will be used for machinery to maintain noise levels.
- Waste Management: An automatic Organic Waste Converter (OWC) with a capacity of 150 kg/day is planned for solid waste management. Construction debris will be used for site leveling.
- Greenbelt: The applicant proposes to plant 108 trees and develop lawn areas within the project premises.
- Rainwater Harvesting: Three percolation wells are planned to recharge the groundwater table.
- Energy Efficiency: Use of LED/CFL lighting, building orientation for natural daylight, and materials with low U-values are proposed to reduce energy consumption.
Key Figures
| Item | Detail |
|---|---|
| Total Units | 135 |
| Max Floors | 14 + Hollow Plinth |
| Basement Levels | 2 |
| STP Capacity | 75 KLD |
| Solar Power Capacity | 70 KW |
| Percolation Wells | 3 |
| Proposed Trees | 108 |
| Common Plot Area | 462.09 sq.m. |
| Fire Water Storage (UG) | 1,00,000 litres |
Vinayak Sapphire-2 site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.1 acres, this one is smaller than 74% of them.
197 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kudasan, Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Samay Aura — environmental approval granted, 0 m away
- Samay Aura — environmental approval granted, 0 m away
- Gravity — environmental approval granted, 200 m away
- Swagat Bellazio — environmental approval granted, 300 m away
- The Stately and Calista — environmental approval granted, 350 m away
- Shamved Green Land — environmental approval granted, 350 m away
- The Privilon — environmental approval granted, 450 m away
- Madhav Parkview — environmental approval granted, 550 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.