Quick answers
What is this project?
Ghanshyamsinh Hemubha Zala(Survey No.Bhadar Riverbed Paiki,Village.Nagnesh,Ta.Ranpur,Dist.Botad) is a rejected mining project in Kinara, Ranpur, Botad, Gujarat. The site covers 4.6 acres.
Who is building it?
The applicant is Ghanshyamsinh Hemubha Zala.
Has it been approved?
No. The application was rejected on 13 Mar 2025.
Where is it?
In Kinara, Ranpur, Botad, Gujarat.
How big is it?
It has a stated cost of ₹5 lakh and a site of 4.6 acres.
When was it filed?
The application was filed on 2 Dec 2024.
Project details
| Status | Not approved |
|---|---|
| Status since | 13 Mar 2025 |
| Application filed | 2 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ghanshyamsinh Hemubha Zala |
| Land area | 4.6 acres (1.9 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Kinara |
| Taluk / tehsil | Ranpur |
| District | Botad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04274 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Dec 2025 | Lapsed | 4.6 acres | ₹25 lakh |
| New project filed 2 Dec 2024 (this page) | Not approved | 4.6 acres | ₹5 lakh |
In context
58 applications in Botad since January 2022 are in the same category (Mining): 24 approved, 22 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.6 acres, this one is smaller than 59% of them.
No other mining lease on record is within 500 m of this site; 21 have applied within 5 km.
Where it is
Kinara, Ranpur, Botad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ghanshyamsinh Hemubha Zala(Survey No.Bhadar Riverbed Paiki… — lapsed, 0 m away
- Ghanshyamsinh Hemubha Zala — returned to applicant, 0 m away
- Bhadar Riverbed Paiki Village.Nagnesh,Ta.Ranpur,Dist.Botad 02.00.00… — environmental approval granted, 550 m away
- Dharmendrasinh Jasubha Zala — returned to applicant, 550 m away
- Jasubha Banubha Zala — lapsed, 800 m away
- Narendrasinh Pravinsinh Zala — returned to applicant, 1 km away
- Shri Zala Jayveersinh Bharatsinh — environmental approval granted, 1.2 km away
- Shri Zala Jayveersinh Bharatsinh — environmental approval granted, 1.2 km away
More from Ghanshyamsinh Hemubha Zala in Botad
- Mahavirsinh Bhavubha Vala — environmental approval granted
- Ghanshyamsinh Hemubha Zala — returned to applicant
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.