Quick answers
What is Aatrey Ivaan-5?
Aatrey Ivaan-5 is an approved residential project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. It plans 252 units in 4 towers of up to 7 floors on 1.4 acres.
Who is building it?
The applicant is Gajanan Corporation.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 2 Aug 2024), as of 27 Nov 2026.
Where is it?
In Chiloda(Naroda) (Ct), Gandhinagar, Gujarat.
How big is it?
It has a stated cost of ₹35 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 11 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 2 Aug 2024 |
| Application filed | 11 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gajanan Corporation |
| Use | Residential |
| Units | 252 |
| Towers | 4 |
| Floors (tallest) | 7 |
| Basements | 1 |
| Parking spaces | 256 |
| Land area | 1.4 acres (0.6 ha) |
| Built-up area | 27,774 m² (2,98,957 sq ft) |
| Plot area | 5,598 m² (60,256 sq ft) |
| Project cost | ₹35 crore |
| Village / locality | Chiloda(Naroda) (Ct) |
| Taluk / tehsil | Gandhinagar |
| District | Gandhinagar |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-04349 |
What the filings say
What is planned
Gajanan Corporation's project report for Aatrey Ivaan-5 describes a new affordable residential housing development. The project is planned to consist of four residential blocks (A, B, C, and D) with a total of 252 units.
According to the building plans, the blocks are designed with a basement, a hollow plinth (ground floor), and seven upper floors. The unit distribution across the blocks is as follows:
- Block A: 28 units
- Block B: 112 units
- Block C: 84 units
- Block D: 28 units
The residential units are categorized by size, with 196 units having a built-up area between 50 and 66 square metres, and 56 units exceeding 66 square metres. The total built-up area for the project is 17,101.70 square metres.
Layout and design
The site layout shows the four blocks arranged around a central common plot of 560.09 square metres. Access to the site is provided via an 18-metre wide Town Planning Scheme (TPS) road. Internal movement is facilitated by a 7-metre wide approach road and 4-metre wide clear margins around the perimeter of the buildings.
Parking is distributed across the basement, hollow plinth, and open surface areas. The applicant proposes a total of 256 car parking spaces (CPS) and additional space for two-wheelers. The basement floor plan indicates a net built-up area of 4,998.58 square metres dedicated to parking and services.
Water, power and access
During the construction phase, water will be sourced from local tankers. For the operation phase, the applicant intends to use water supplied by the Ahmedabad Municipal Corporation (AMC). The total water requirement is estimated at 200 kilolitres per day (KLD).
Wastewater will be treated in an onsite Sewage Treatment Plant (STP) with a capacity of 200 KLD using the Activated Sludge Process. Treated water will be reused for gardening and toilet flushing, with any excess discharged into the AMC drainage line.
Power will be supplemented by a roof-top solar energy installation of 122.44 KW, occupying approximately 2,443.1 square metres of terrace space. The project includes two rain water harvesting recharge wells.
Environmental safeguards
The Environmental Management Plan (EMP) includes a capital expenditure of ₹3.59 crore. Key components include:
- Solid Waste: An automatic Organic Waste Converter (OWC) will process approximately 329 kg/day of wet waste into compost for the greenbelt. Dry waste will be collected by the municipal authority.
- Greenbelt: The applicant plans to plant 140 trees and develop lawn areas.
- Air and Noise: Dust mitigation measures, acoustic enclosures for the diesel generator set, and earplugs for workers are planned during construction.
- Safety: Firefighting systems will be installed as per state fire protection service norms, including a dedicated fire water tank and concealed copper wiring.
Timeline
The applicant's implementation plan for capital expenditure spans three years, starting from 2024-25 and concluding in 2026-27. The majority of the environmental and safety infrastructure spending, including the STP and firefighting systems, is scheduled for the final year of this period.
Aatrey Ivaan-5 site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 51% of them.
133 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Residential Affordable Housing project "AATREY IVAAN-6" by Aatrey Naroda… — environmental approval granted, 50 m away
- Residential Affordable Housing project "AATREY IVAAN-6" by Aatrey Naroda… — returned to applicant, 50 m away
- Residential Affordable Housing project "AATREY IVAAN-6" by Aatrey Naroda… — returned to applicant, 50 m away
- Residential Affordable Housing project "AATREY IVAAN-6" by Aatrey Naroda… — environmental approval granted, 50 m away
- Sanidhya Heights — environmental approval granted, 100 m away
- Aatrey Ivaan - 4 — environmental approval granted, 150 m away
- The Rhythm Elevat — environmental approval granted, 150 m away
- Shyam Status 4 — more information requested, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.