Environmental approval grantedBuildings & townships · Gandhinagar, Gujarat

Aatrey Ivaan - 4

Aatrey Ivaan - 4 is an approved building project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The site covers 1.7 acres. Its stated project cost is ₹31.6 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Mar 2023).

See it on the live map All projects in Gandhinagar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Aatrey Ivaan - 4?

Aatrey Ivaan - 4 is an approved building project in Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The site covers 1.7 acres.

Who is building it?

The applicant is Ashtavinayak Corporation.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Mar 2023), as of 27 Nov 2026.

Where is it?

In Chiloda(Naroda) (Ct), Gandhinagar, Gujarat.

How big is it?

It has a stated cost of ₹31.6 crore and a site of 1.7 acres.

When was it filed?

The application was filed on 10 Mar 2023.

Project details

StatusEnvironmental approval granted
Status since10 Mar 2023
Application filed10 Mar 2023
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantAshtavinayak Corporation
Land area1.7 acres (0.7 ha)
Project cost₹31.6 crore
Village / localityChiloda(Naroda) (Ct)
Taluk / tehsilGandhinagar
DistrictGandhinagar
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-00744

What the filings say

What is planned

Ashtavinayak Corporation proposes to develop a residential affordable housing project named Aatrey Ivaan - 4 in Chiloda, Gandhinagar. The applicant's project report describes a development consisting of five residential blocks (Blocks A, B, C, D, and E) with a maximum height of seven floors (Ground + 7 floors).

The project is designed to provide a total of 308 residential units. The layout includes a security cabin and an electrical substation as supporting infrastructure. The total built-up area is planned at 28,029.84 square metres, with a Floor Space Index (FSI) area of 19,028.60 square metres.

Layout and design

The project is situated on a plot of 7,048.00 square metres (0.7 hectares). The site layout features a central common plot of 705.91 square metres. Internal access is provided by 7.50-metre wide approach roads within the complex, connecting to an 18.00-metre wide Town Planning Scheme (TPS) road.

Parking is planned at the surface and basement levels. The ground floor layout includes dedicated spaces for an organic waste converter, a waste segregation area for dry and wet waste, and an underground water storage tank. The residential blocks are arranged around the central common area and internal driveways, which range from 2.00 to 2.37 metres in width.

ItemDetail
Total Plot Area7,048.00 square metres (0.7 hectares)
Total Built-up Area28,029.84 square metres
Total FSI Area19,028.60 square metres
Total Residential Units308
Number of Blocks5 (A, B, C, D, E)
Maximum FloorsG + 7
Common Plot Area705.91 square metres
Tree Plantation Required177 trees
Solar Power Capacity139 KW

Water, power and access

During the construction phase, water will be sourced from local water tanker suppliers. For the operation phase, the applicant intends to use the Ahmedabad Municipal Corporation (AMC) water supply. The project includes an onsite sewage treatment plant (STP) with a capacity of 230 kilolitres per day (KLD) using the Activated Sludge Process. Treated water will be reused for gardening and toilet flushing, with any excess discharged into the AMC drainage line.

Power will be supplemented by a 139 KW rooftop solar system covering 1,095.7 square metres of terrace space. Two percolating wells are planned for rainwater harvesting. Access to the site is provided via an 18-metre wide road, with separate entry and exit points for traffic regulation.

Environmental safeguards

The Environmental Management Plan (EMP) allocates ₹2.49 crore for capital expenditure and ₹9.7 lakh for annual recurring costs. Key measures include:

Timeline

The applicant indicates that construction expenses are scheduled over a three-year period starting from 2023-24, following the grant of environmental clearance. The implementation plan for capital expenditure is phased as ₹29.64 lakh in the first year, ₹81.63 lakh in the second year, and ₹137.83 lakh in the third year.

Aatrey Ivaan - 4 site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Aatrey Ivaan - 4: Layout and ground floor plan: blocks, roads, and common plot (preview)🔒 Sign in free to see it
Layout and ground floor plan: blocks, roads, and common plot
Aatrey Ivaan - 4: Site parking layout plan showing basement and surface parking (preview)🔒 Sign in free to see it
Site parking layout plan showing basement and surface parking
Aatrey Ivaan - 4: Project location map and satellite view with coordinates (preview)🔒 Sign in free to see it
Project location map and satellite view with coordinates

In context

472 applications in Gandhinagar since January 2022 are in the same category (Buildings & townships): 365 approved, 79 filed or under review, and 28 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.7 acres, this one is larger than 63% of them.

131 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Chiloda(Naroda) (Ct), Gandhinagar, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.