Quick answers
What is this project?
Khadki Blacktrap Mining Project, Survey No. 365 Paiki, proposed by Shree Ghanshyam Stone Quarry is an approved mining project in Khadki, Pardi, Valsad, Gujarat. The site covers 3 acres.
Who is building it?
The applicant is Shree Ghanshyam Stone Quarry.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Apr 2025), as of 27 Nov 2026.
Where is it?
In Khadki, Pardi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹2.5 crore and a site of 3 acres.
When was it filed?
The application was filed on 29 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Apr 2025 |
| Application filed | 29 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Shree Ghanshyam Stone Quarry |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Khadki |
| Taluk / tehsil | Pardi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05138 |
In context
92 applications in Valsad since January 2022 are in the same category (Mining): 24 approved, 10 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 3 acres, this one is larger than 55% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 17 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Khadki, Pardi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Orwad Blacktrap Mining project, Survey No. 64/A/2, Proposed by Rameshbhai… — environmental approval granted, 100 m away
- R, Desai & Co (Orwad Blacktrap Block) — lapsed, 250 m away
- 4" Steel Pipeline and 125/90mm Dia PE at Pariya Road, Velaparva Road to… — lapsed, 3.6 km away
- 4" Steel Pipeline and 125/90 mm Dia PE at Pariya Road, Velaparva Road to… — forest land use approved, 3.6 km away
- Morai Blacktrap Mining Project, Survey No. 63, Proposed by Shri Mukesh… — lapsed, 3.9 km away
- Mukesh Rajendraprasad Thakur — lapsed, 4 km away
- Morai Blacktrap Mining Project, Survey No. 63 Paiki, Proposed by Smt.… — lapsed, 4.1 km away
- Morai Blacktrap Mining Project, Survey No. 63 Paiki, Proposed by Smt.… — lapsed, 4.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.