Quick answers
What is this project?
Morai Blacktrap Mining Project, Survey No. 63, Proposed by Shri Mukesh Rajendraprasad Thakur is a lapsed mining project in Morai, Vapi, Valsad, Gujarat. The site covers 1.4 acres.
Who is building it?
The applicant is Mukesh R Thakur.
Has it been approved?
No. The application was lapsed on 18 Feb 2025, so it is no longer under consideration.
Where is it?
In Morai, Vapi, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹2 crore and a site of 1.4 acres.
When was it filed?
The application was filed on 22 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Feb 2025 |
| Application filed | 22 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Mukesh R Thakur |
| Land area | 1.4 acres (0.6 ha) |
| Project cost | ₹2 crore |
| Village / locality | Morai |
| Taluk / tehsil | Vapi |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06729 |
In context
92 applications in Valsad since January 2022 are in the same category (Mining): 24 approved, 10 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.4 acres, this one is smaller than 86% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 6.4 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Morai, Vapi, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mukesh Rajendraprasad Thakur — lapsed, 50 m away
- Morai Blacktrap Mining Project, Survey No. 63 Paiki, Proposed by Smt.… — lapsed, 150 m away
- Morai Blacktrap Mining Project, Survey No. 63 Paiki, Proposed by Smt.… — lapsed, 150 m away
- Rob in Liew of Lc No 82 at Km 177/6-8 Between Vapi-Udwada on Virar-Surat… — forest land use approved, 700 m away
- Power project by M/s. Welspun Living Limited — environmental approval granted, 700 m away
- "The Construction Project by M/s Payal Properties Private Limited" Located at… — environmental approval granted, 1.4 km away
- Proposed Expansion of Project for Manufacturing of Synthetic Organic Chemicals… — under environmental review, 1.7 km away
- Avadh Begonia — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.