Quick answers
What is Mining project by M/s. SHRI ASHISH KUMAR SINGH?
This proposed mining project by M/s. SHRI ASHISH KUMAR SINGH is in Haroda, Lakhpat, Kachchh, Gujarat. The site covers 4.9 acres.
Who is building it?
The applicant is Ashish Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 29 May 2025), as of 27 Nov 2026.
Where is it?
In Haroda, Lakhpat, Kachchh, Gujarat.
How big is it?
It has a stated cost of ₹10 crore and a site of 4.9 acres.
When was it filed?
The application was filed on 5 Jun 2024.
One of 5 filings for this project. The project's main page, with every filing and where each stands: Mining project by M/s. SHRI ASHISH KUMAR SINGH
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 29 May 2025 |
| Application filed | 5 Jun 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ashish Singh |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹10 crore |
| Village / locality | Haroda |
| Taluk / tehsil | Lakhpat |
| District | Kachchh |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05245 |
All filings for this project
This project has 5 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Apr 2026 | Environmental approval granted | 4.9 acres | ₹10 crore |
| New project filed 11 Apr 2026 | Environmental approval granted | 4.9 acres | ₹7.3 crore |
| New project filed 30 Aug 2024 | Lapsed | 4.9 acres | ₹9.3 crore |
| Early planning filed 5 Jun 2024 (this page) | Cleared for impact study | 4.9 acres | ₹10 crore |
| Early planning filed 2 Feb 2024 | Cleared for impact study | 4.9 acres | ₹7.3 crore |
In context
1,132 applications in Kachchh since January 2022 are in the same category (Mining): 683 approved, 276 filed or under review, and 173 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 4.9 acres, this one is smaller than 63% of them.
10 other mining leases have applied within 500 m of this site; together with this one they cover 58.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 14 mining leases have applied within 5 km.
Where it is
Haroda, Lakhpat, Kachchh, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining project by M/s. SHRI ASHISH KUMAR SINGH — environmental approval granted, 0 m away
- Mining project by M/s. ARUNKUMAR GOPAL CHHANGA — environmental approval granted, 100 m away
- Mining project by M/s. ARUNKUMAR GOPAL CHHANGA — cleared for impact study, 100 m away
- Khasa Bhavesh Devkaran — environmental approval granted, 200 m away
- Khasa Bhavesh Devkaran — cleared for impact study, 200 m away
- MKC Infrastructure LTD (Haroda Blacktrap Block -Q) — under environmental review, 200 m away
- Shri Abdreman F Khalifa — environmental approval granted, 250 m away
- Shri Abdreman F Khalifa — cleared for impact study, 250 m away
More from Ashish Singh in Kachchh
- Ashish Kumar Singh — lapsed
- Ashish Kumar Singh. — environmental approval granted
- Shri Ashish Kumar Singh (Nana Nakhatrana Black Trap Block-B) — under environmental review
- Shri Ashish Kumar Singh(Nana Nakhatrana Black Trap Block-C) — under environmental review
- Shri Ashish Kumar Singh (Haroda Black Trap Block- O) — under environmental review
- Shri Ashish Kumar Singh (Nakhatrana Black Trap Block - C) — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.