Residential Project "rng Sky World" by Mr. Pareshbhai Hemrajbhai Gangani at Block No.: 291, F.P. No.: 26, O.P. No.: 19, T.P.S. No.: 14 (Pal), Moje: Pal, Tal.: Adajan, Dist.: Surat – 395009 is an approved residential project in Rainwater Recharge System, Surat, Gujarat. It plans 72 units in 2 towers of up to 19 floors on 1 acre.
Who is building it?
The applicant is Gangani Paresh Hemrajbhai.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Mar 2025), as of 27 Nov 2026.
Where is it?
In Rainwater Recharge System, Surat, Gujarat.
How big is it?
It has a stated cost of ₹63 crore and a site of 1 acre.
When was it filed?
The application was filed on 6 Oct 2024.
Project details
| Official title | Proposed Construction of Residential Project "rng Sky World" by Mr. Pareshbhai Hemrajbhai Gangani at Block No.: 291, F.P. No.: 26, O.P. No.: 19, T.P.S. No.: 14 (Pal), Moje: Pal, Tal.: Adajan, Dist.: Surat – 395009. |
|---|---|
| Status | Environmental approval granted |
| Status since | 18 Mar 2025 |
| Application filed | 6 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Gangani Paresh Hemrajbhai |
| Use | Residential |
| Units | 72 |
| Towers | 2 |
| Floors (tallest) | 19 |
| Basements | 2 |
| Height | 70 m |
| Parking spaces | 204 |
| Land area | 1 acres (0.4 ha) |
| Built-up area | 27,925 m² (3,00,582 sq ft) |
| Plot area | 4,106 m² (44,197 sq ft) |
| Project cost | ₹63 crore |
| Village / locality | Rainwater Recharge System |
| District | Surat |
| State | Gujarat |
| Location from | District |
| Our reference | WID-GJ-05600 |
What the filings say
What is planned
The applicant, Mr. Pareshbhai Hemrajbhai Gangani, proposes to construct a residential project named "RNG Sky World" in Surat. The project consists of two residential buildings, designated as Type A and Type B, both reaching a height of 69.51 metres.
According to the conceptual plan, each building will have two levels of basement, a ground floor, and 19 upper floors. The development will provide a total of 72 residential units, including:
- 68 flats with 4 BHK (Bedroom, Hall, Kitchen) configurations, located from the 1st to the 17th floors.
- 4 penthouses with 5 BHK configurations, located on the 18th and 19th floors.
Amenities such as a banquet hall and a gym are planned for the ground floor. The total built-up area is 27,925.24 square metres, with a Floor Space Index (FSI) area of 16,423.48 square metres.
Layout and design
The site layout includes a central lawn area of 416.80 square metres. Internal roads of 6.00 metres width will surround the buildings. Each building is designed with two staircases of 2.00 metres width, two common lifts, and one dedicated fire lift. The design incorporates earthquake-proof Reinforced Cement Concrete (RCC) structures, Grahamite tile flooring, and flat roofs with waterproofing.
Parking facilities will be provided across two basement levels, the hollow plinth, and open parking areas, covering a total of 6,462.26 square metres.
Land and surroundings
The project is located on 0.41 hectares (1.01 acres) of private non-agricultural land at Pal in the Adajan taluk. The site is situated within Surat city limits. The nearest major transport links include the Udhana Railway Station, approximately 7.50 km to the east-northeast, and Surat International Airport, about 8.96 km to the southwest. The Tapi River is located approximately 1.62 km to the southeast. The applicant states there are no national parks or wildlife sanctuaries within a 10 km radius.
Water, power and access
During the operational phase, the total water requirement is estimated at 68.0 KLD (kilolitres per day), to be supplied by the Surat Municipal Corporation. This includes 42.0 KLD of fresh water and 26.0 KLD of recycled treated wastewater for flushing and gardening. During the monsoon, the total requirement is slightly lower at 65.0 KLD.
Power will be sourced from Dakshin Gujarat Vij Company Limited (DGVCL), with a total operational requirement of 1,055 KWH. Two diesel generator sets of 300 KVA each are proposed for backup power. The site is accessible via an existing 18-metre wide road.
Environmental safeguards
A Sewage Treatment Plant (STP) will be installed to treat domestic wastewater. Treated water will be reused for flushing and gardening, with the remaining 29.0 KLD (during non-monsoon) discharged into the municipal drainage system.
Solid waste management plans include the segregation of waste into biodegradable and dry categories using green and blue bins. An organic waste converter with a capacity of 200 kg/day will process biodegradable waste into manure for use in the project's green belt. The green belt will cover 960.80 square metres, including a tree-covered area of 544 square metres where 136 trees of various varieties are proposed for planting.
Timeline
The project implementation is scheduled to take approximately 35 months from commencement. Key phases include:
- Foundation and plinth work: 3 months
- Basement and ground floor works: 4 months
- Construction of 1st to 19th floors: 18 months
- Finishing works (plaster, plumbing, electrification, and colour): 12 months (some phases running concurrently)
- Terrace cabin and social infrastructure works: 4 months
Mr. Pareshbhai Hemrajbhai Residential Project "rng Sky World" site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1 acre, this one is smaller than 85% of them.
Where it is
Rainwater Recharge System, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Protected Forest Land of 0.3155 Hac. for Forest Clearance for… — forest land use approved, 2.2 km away
- (1)125 mm dia. PE Pipeline domestic & commercial connection at Kadodara NHAI,… — forest land use approved, 2.2 km away
- Diversion of 1.3756 Ha Protected Forest Land for Construction of Earthen to… — more information requested, 3.3 km away
- Ugam Luxuria — under environmental review, 4.1 km away
- Anjali House — environmental approval granted, 4.7 km away
- Navkar Lake City — environmental approval granted, 5.3 km away
- Riddhi Palace — environmental approval granted, 5.3 km away
- Shagun Heaven — environmental approval granted, 5.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.