Quick answers
What is Industrial project by M/s. Anu Products Limited?
This approved industrial project by M/s. Anu Products Limited is in Sarigam, Umbergaon, Valsad, Gujarat. The site covers 0.7 acres.
Who is building it?
The applicant is Anu Products Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 4 Sept 2024), as of 27 Nov 2026.
Where is it?
In Sarigam, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹20 crore and a site of 0.7 acres.
When was it filed?
The application was filed on 17 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 4 Sept 2024 |
| Application filed | 17 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Anu Products Limited |
| Land area | 2,800 m² |
| Project cost | ₹20 crore |
| Village / locality | Sarigam |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05905 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Apr 2024 (this page) | Environmental approval granted | 0.7 acres | ₹20 crore |
| Early planning filed 14 Jun 2023 | Cleared for impact study | 0.7 acres | ₹20 crore |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.7 acres, this one is smaller than 72% of them.
127 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarigam, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Anu Products Limited — cleared for impact study, 0 m away
- Industrial project by Aayush Medication Private Limited — more information requested, 100 m away
- Industrial project by Gloy Meta LLP — under environmental review, 100 m away
- Proposed expansion Project for the Manufacturing of Synthetic Organic Chemical… — environmental approval granted, 150 m away
- Proposed expansion Project for the Manufacturing of Synthetic Organic Chemical… — cleared for impact study, 150 m away
- Expansion of Synthetic Organic Manufacturing Unit — environmental approval granted, 150 m away
- Proposed Expansion in Existing Dye Intermediates and Speciality Chemicals… — environmental approval granted, 150 m away
- Proposed Expansion in Existing Dye Intermediates and Speciality Chemicals… — lapsed, 150 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.