Quick answers
What is Industrial project by Gloy Meta LLP?
This proposed industrial project by Gloy Meta LLP is in Sarigam, Umbergaon, Valsad, Gujarat. The site covers 0.2 acres.
Who is building it?
The applicant is Gloy Meta LLP.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Sarigam, Umbergaon, Valsad, Gujarat.
How big is it?
It has a stated cost of ₹64 lakh and a site of 0.2 acres.
When was it filed?
The application was filed on 9 Jun 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 8 Sept 2026 |
| Application filed | 9 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gloy Meta LLP |
| Land area | 900 m² |
| Project cost | ₹64 lakh |
| Village / locality | Sarigam |
| Taluk / tehsil | Umbergaon |
| District | Valsad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11446 |
In context
283 applications in Valsad since January 2022 are in the same category (Industry): 174 approved, 79 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.2 acres, this one is smaller than 96% of them.
129 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarigam, Umbergaon, Valsad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by Aayush Medication Private Limited — more information requested, 50 m away
- Industrial project by M/s. Anu Products Limited — environmental approval granted, 100 m away
- Industrial project by M/s. Anu Products Limited — cleared for impact study, 100 m away
- Expansion of Synthetic Organic Manufacturing Unit — environmental approval granted, 100 m away
- Proposed expansion project for the manufacturing of Synthetic Organic… — cleared for impact study, 100 m away
- Proposed expansion Project for the Manufacturing of Synthetic Organic Chemical… — environmental approval granted, 200 m away
- Proposed expansion Project for the Manufacturing of Synthetic Organic Chemical… — cleared for impact study, 200 m away
- Proposed Expansion in Existing Dye Intermediates and Speciality Chemicals… — environmental approval granted, 250 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.