Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Jul 2024 |
| Application filed | 17 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Pink Rose Pigments Private Limited |
| Land area | 2,000 m² |
| Project cost | ₹4.6 crore |
| Village / locality | Pinglaj |
| Taluk / tehsil | Kheda |
| District | Kheda |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06122 |
In context
36 applications in Kheda since January 2022 are in the same category (Industry): 26 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.5 acres, this one is smaller than 75% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pinglaj, Kheda, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Godrej Industries Ltd. — environmental approval granted, 1000 m away
- Industrial project by M/s. H. H. Polymers — environmental approval granted, 1.7 km away
- Proposed Project of Synthetic Organic Chemicals by M/s. Shivchem Speciality… — environmental approval granted, 2.4 km away
- Proposed Project of Synthetic Organic Chemicals by M/s. Shivchem Speciality… — cleared for impact study, 2.4 km away
- Proposed expansion of existing Moulding Powder unit to Resin and Moulding… — environmental approval granted, 3.1 km away
- Proposed 125 mm dia MDPE underground natural gas Pipeline originate from GGS -… — more information requested, 3.1 km away
- Proposed laying of 125 mm Dia MDPE UG Gas pipeline parallel on Navagam - Nayka… — in-principle approval, conditions pending, 5.7 km away
- Industrial project by M/s. Accent Microcell Limited (Unit – III) — under environmental review, 5.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.