Project details
| Status | Not approved |
|---|---|
| Status since | 1 Apr 2025 |
| Application filed | 24 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Dharmendrasinh Ratansinh Yadav |
| Land area | 6.4 acres (2.6 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Aladar |
| Taluk / tehsil | Vagra |
| District | Bharuch |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06225 |
In context
292 applications in Bharuch since January 2022 are in the same category (Mining): 162 approved, 50 filed or under review, and 80 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 6.4 acres, this one is larger than 61% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Aladar, Vagra, Bharuch, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to ONGC Plans 78 Oil and Gas Wells in Bharuch, Gujarat (11 km away).
Other projects nearby
- 765kV D/C Ahmedabad- Navsari transmission line associated with transmission… — coastal clearance granted, 4 km away
- Diversion of 0.5330Ha for 11 KV transmission line 3 core 185 sqmm XLPE Cable… — more information requested, 4.8 km away
- Industrial Park (IP) and Multi Product SEZ by M/s. Dahej SEZ Limited — environmental approval granted, 5.1 km away
- Four Lanning of Amod Muler Dahej Road Km. 0/00 to 45/800 — lapsed, 5.6 km away
- Rdss Project, Bharuch Dgvcl : Development of Distribution Infrastructure Work… — lapsed, 5.7 km away
- Four Lanning of Amod Muler Dahej Road Km. 0/00 to 45/800 — lapsed, 6.3 km away
- Proposed Synthetic Organic Chemicals Manufacturing (Specialty Chemicals) Unit… — cleared for impact study, 6.5 km away
- Proposed Hindalco E-waste & Secondary Copper Recycling Project with Production… — environmental approval granted, 7.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.