Project details
| Official title | Set Up of Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant Along With Cell Pack Assembly and Cell Supply-Chain Ecosystem With Proposed Built-Up Area of Nearly 4,48,407.8 Sq. Mtrs |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Aug 2024 |
| Application filed | 5 Jul 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Agratas Energy Storage Solutions Private Limited |
| Use | Industrial |
| Towers | 7 |
| Parking spaces | 1,121 |
| Land area | 321.2 acres (130 ha) |
| Built-up area | 4,48,408 m² (48,26,619 sq ft) |
| Plot area | 13,00,000 m² (1,39,93,070 sq ft) |
| Project cost | ₹10,700 crore |
| Village / locality | Bol |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06231 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 5 Jul 2024 (this page) | Environmental approval granted | 321.2 acres | ₹10,700 crore |
| Early planning filed 4 Mar 2024 | Cleared for impact study | 321.2 acres | ₹10,700 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 321.2 acres, this one is larger than 98% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bol, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — cleared for impact study, 0 m away
- ESIC Hospital at Sanand — environmental approval granted, 500 m away
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — initial checks, 1.5 km away
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — under environmental review, 1.5 km away
- Industrial project by M/s. Raviraj Foils. Ltd. — cleared for impact study, 2.3 km away
- Industrial project by MetTube Copper India Private Limited — cleared for impact study, 3 km away
- Proposed project for manufacturing of Insulin Aspart,Insulin Glargine,Insulin… — environmental approval granted, 3.1 km away
- Industrial project by Biogenomics Limited — environmental approval granted, 3.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.