Project details
| Official title | Proposed Construction of Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary Facilities) by M/S. Tata Motors Passenger Vehicles Limited. |
|---|---|
| Status | Under environmental review |
| Status since | 4 Nov 2026 |
| Application filed | 10 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Tata Motors Passenger Vehicles Limited |
| Use | Industrial |
| Height | 12 m |
| Parking spaces | 2,070 |
| Land area | 1,100 acres (445.2 ha) |
| Built-up area | 2,98,939 m² (32,17,750 sq ft) |
| Plot area | 44,51,700 m² (4,79,17,654 sq ft) |
| Project cost | ₹3,474.6 crore |
| Village / locality | Chharodi |
| Taluk / tehsil | Sanand |
| District | Ahmadabad |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-11792 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Nov 2026 | Initial checks | 1,100 acres | ₹3,474.6 crore |
| Early planning filed 10 Aug 2026 (this page) | Under environmental review | 1,100 acres | ₹3,474.6 crore |
In context
1,175 applications in Ahmadabad since January 2022 are in the same category (Buildings & townships): 916 approved, 201 filed or under review, and 58 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1,100 acres, this one is larger than 99% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chharodi, Sanand, Ahmadabad, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial Buildings/Sheds (Extension of Factory Built-Up Area for Ancillary… — initial checks, 0 m away
- Industrial project by M/s. Raviraj Foils. Ltd. — cleared for impact study, 750 m away
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — environmental approval granted, 1.5 km away
- Greenfield ~20gwh Lithium-Ion Cell Manufacturing Plant — cleared for impact study, 1.5 km away
- ESIC Hospital at Sanand — environmental approval granted, 1.6 km away
- Industrial project by MetTube Copper India Private Limited — cleared for impact study, 3.8 km away
- Industrial project by Transfer of EC of M/s. R B Polymers Ltd. — environmental approval granted, 4 km away
- Proposed project for manufacturing of Insulin Aspart,Insulin Glargine,Insulin… — environmental approval granted, 4.1 km away
All 3 Tata Motors Passenger projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.