What is Developing? Open the mapMap

Cleared for impact studyPipelines · Devbhumi Dwarka, Gujarat

Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery to Berth D and Desalination Plant, New sea water intake, Sea Water supply and Reject pipelines at Vadinar, District - Devbhumi Dwarka, Gujarat of M/s Nayara Energy Limited

Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery to Berth D and Desalination Plant, New sea water intake, Sea Water supply and Reject pipelines at Vadinar, District - Devbhumi Dwarka, Gujarat of M/s Nayara Energy Limited is a proposed pipeline project in Bharana, Khambhalia, Devbhumi Dwarka, Gujarat. The site covers 74.2 acres. Its stated project cost is ₹8,400 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 May 2024).

See it on the live map All projects in Devbhumi Dwarka

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery to Berth D and Desalination Plant, New sea water intake, Sea Water supply and Reject pipelines at Vadinar, District - Devbhumi Dwarka, Gujarat of M/s Nayara Energy Limited is a proposed pipeline project in Bharana, Khambhalia, Devbhumi Dwarka, Gujarat. The site covers 74.2 acres.

Who is building it?

The applicant is Nayara Energy Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 8 May 2024), as of 27 Nov 2026.

Where is it?

In Bharana, Khambhalia, Devbhumi Dwarka, Gujarat.

How big is it?

It has a stated cost of ₹8,400 crore and a site of 74.2 acres.

When was it filed?

The application was filed on 22 Jan 2024.

Project details

StatusCleared for impact study
Status since8 May 2024
Application filed22 Jan 2024
Approval soughtEnvironmental approval
Application typeEarly planning
SectorPipelines
ApplicantNayara Energy Limited
Land area74.2 acres (30 ha)
Project cost₹8,400 crore
Village / localityBharana
Taluk / tehsilKhambhalia
DistrictDevbhumi Dwarka
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-06309

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Feb 2025More information requested74.2 acres₹8,400 crore
Early planning filed 22 Jan 2024 (this page)Cleared for impact study74.2 acres₹8,400 crore

In context

10 applications in Devbhumi Dwarka since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Bharana, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Nayara Energy Limited in Devbhumi Dwarka

4 Nayara Energy projects in Devbhumi Dwarka
All 61 Nayara Energy projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.