Quick answers
What is this project?
Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery to Berth D and Desalination Plant, New sea water intake, Sea Water supply and Reject pipelines at Vadinar, District - Devbhumi Dwarka, Gujarat of M/s Nayara Energy Limited is a proposed pipeline project in Bharana, Khambhalia, Devbhumi Dwarka, Gujarat. The site covers 74.2 acres.
Who is building it?
The applicant is Nayara Energy Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 May 2024), as of 27 Nov 2026.
Where is it?
In Bharana, Khambhalia, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹8,400 crore and a site of 74.2 acres.
When was it filed?
The application was filed on 22 Jan 2024.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 May 2024 |
| Application filed | 22 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Pipelines |
| Applicant | Nayara Energy Limited |
| Land area | 74.2 acres (30 ha) |
| Project cost | ₹8,400 crore |
| Village / locality | Bharana |
| Taluk / tehsil | Khambhalia |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-06309 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Feb 2025 | More information requested | 74.2 acres | ₹8,400 crore |
| Early planning filed 22 Jan 2024 (this page) | Cleared for impact study | 74.2 acres | ₹8,400 crore |
In context
10 applications in Devbhumi Dwarka since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bharana, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery… — more information requested, 0 m away
- Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery… — more information requested, 450 m away
- Post - Facto Permission under Wild Life Protection – act 1972 Proposal for use… — more information requested, 4.6 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 5.4 km away
- Re-CRZ Clearance for development of Outfitting Jetty & Floating Dry Dock… — lapsed, 5.4 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — under wildlife review, 5.5 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 5.5 km away
- Wildlife clearance for development of Out Fitting Jetty & Floating Dry Complex… — more information requested, 5.5 km away
More from Nayara Energy Limited in Devbhumi Dwarka
- EC amendment for expansion of Refinery capacity from 9 MMTPA to 60 MMTPA with… — returned to applicant
- Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery… — more information requested
4 Nayara Energy projects in Devbhumi Dwarka
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.