Quick answers
What is this project?
EC amendment for expansion of Refinery capacity from 9 MMTPA to 60 MMTPA with Petrochemical Complex at Khambalia, Devbhumi Dwarka District, Gujarat by M/s Nayara Energy Limited is a proposed industrial project in Kathi Devaliya, Khambhalia, Devbhumi Dwarka, Gujarat. The site covers 5,621.6 acres.
Who is building it?
The applicant is Nayara Energy Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kathi Devaliya, Khambhalia, Devbhumi Dwarka, Gujarat.
How big is it?
It has a stated cost of ₹535.4 crore and a site of 5,621.6 acres.
When was it filed?
The application was filed on 27 May 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 17 Jun 2025 |
| Application filed | 27 May 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Nayara Energy Limited |
| Land area | 5,621.6 acres (2,275 ha) |
| Project cost | ₹535.4 crore |
| Village / locality | Kathi Devaliya |
| Taluk / tehsil | Khambhalia |
| District | Devbhumi Dwarka |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-05248 |
In context
8 applications in Devbhumi Dwarka since January 2022 are in the same category (Industry): 4 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kathi Devaliya, Khambhalia, Devbhumi Dwarka, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — lapsed, 4.2 km away
- Proposed 1 MMTPA Bio Fuel Complex Located Near Kajurda Village, Taluka… — returned to applicant, 4.2 km away
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — environmental approval granted, 4.2 km away
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — cleared for impact study, 4.2 km away
- Environment Clearance for Proposed 1 MMTPA Bio Fuel Complex Located Near… — returned to applicant, 4.2 km away
- Power project by Essar Power Salaya Limited — lapsed, 4.4 km away
- Expansion of Existing 1200 MW by adding 1600 MW — cleared for impact study, 4.5 km away
- ESSAR Future Energy Limited Connectivity — under forest review, 5 km away
More from Nayara Energy Limited in Devbhumi Dwarka
- Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery… — more information requested
- Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery… — more information requested
- Crude, Petroleum and Petrochemical Products Pipelines Corridor from Refinery… — cleared for impact study
4 Nayara Energy projects in Devbhumi Dwarka
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.