Quick answers
What is Firdos Heights?
Firdos Heights is an approved mixed-use project in Bhanodra, Chorasi, Surat, Gujarat. It plans 269 units in 5 towers of up to 13 floors on 1.5 acres.
Who is building it?
The applicant is Anvar Patel.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Aug 2024), as of 27 Nov 2026.
Where is it?
In Bhanodra, Chorasi, Surat, Gujarat.
How big is it?
It has a stated cost of ₹25.1 crore and a site of 1.5 acres.
When was it filed?
The application was filed on 19 Apr 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Aug 2024 |
| Application filed | 19 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Anvar Patel |
| Use | Mixed use |
| Units | 269 |
| Towers | 5 |
| Floors (tallest) | 13 |
| Basements | 1 |
| Parking spaces | 319 |
| Land area | 1.5 acres (0.6 ha) |
| Built-up area | 25,353 m² (2,72,897 sq ft) |
| Plot area | 6,010 m² (64,691 sq ft) |
| Project cost | ₹25.1 crore |
| Village / locality | Bhanodra |
| Taluk / tehsil | Chorasi |
| District | Surat |
| State | Gujarat |
| Location from | Site area on record |
| Our reference | WID-GJ-06639 |
What the filings say
What is planned
Firdos Heights is a proposed residential and commercial project under an affordable housing scheme. The applicant, Anvar Patel, plans to construct five buildings (Blocks A to E) and a commercial section. The project will provide a total of 218 residential units and 53 shops.
According to the layout plans, the building heights and floor counts are as follows:
- Blocks A, B, and C: 37.81 metres high with 11 floors.
- Blocks D and E: 40.86 metres high with 12 floors.
The residential component includes 3BHK units. The commercial area is planned for the ground and first floors of the complex. The total built-up area for the project is 25,353.28 square metres, with a Floor Space Index (FSI) area of 16,132.38 square metres.
Layout and design
The project is designed with a basement for parking and services. The ground floor will accommodate both parking and commercial shops. A common plot area of 601.73 square metres is designated for the project, divided into two sections (C.O.P.-1 of 387.47 square metres and C.O.P.-2 of 214.26 square metres).
| Item | Detail |
|---|---|
| Net Plot Area | 6,010.00 square metres |
| Total Built-up Area | 25,353.28 square metres |
| Total Residential Units | 218 |
| Total Commercial Units | 53 Shops |
| Total Parking Area Provided | 5,036.00 square metres |
| Common Plot Area | 601.73 square metres |
| Proposed Green Area | 906.11 square metres (15.07%) |
Land and surroundings
The project is located on Final Plot No. 154 (Original Plot No. 154) in Town Planning Scheme No. 44 (Bhanodra), Surat. The site is bounded by a 24.00-metre wide road and an 18.00-metre wide road. Nearby landmarks identified in the key plan include a sports complex, a police station, and social infrastructure plots.
Water, power and access
Water requirements will be met through the local municipal supply. For rainwater management, the applicant proposes two percolating recharge wells.
Power will be sourced from the local grid, supplemented by a 75 KW rooftop solar system covering 450 square metres of terrace space. Diesel Generator (DG) sets will be installed in the basement with acoustic enclosures for emergency backup. Access to the site is provided via the surrounding 24-metre and 18-metre wide roads, with internal roads planned at 6.00 metres wide.
Parking is distributed across the basement, ground floor, and hollow plinth levels, providing space for both four-wheelers and two-wheelers. The total proposed parking area is 5,036.00 square metres.
Environmental safeguards
The Environmental Management Plan (EMP) includes a 150 Kilo Litres per Day (KLD) Sewage Treatment Plant (STP) of the MBBR (Moving Bed Biofilm Reactor) type. For solid waste, an automatic Organic Waste Converter (OWC) with a capacity of 350 kg/day is planned.
The green belt development plan specifies a total green area of 906.11 square metres, which includes 293.14 square metres of tree-covered area and 612.97 square metres of lawn. The applicant intends to plant 160 trees of species such as Asopalav, Gulmohar, Palm, Badam, and Neem.
Timeline
The applicant's project report states that the entire project is expected to be completed within approximately four years. Installation of environmental management units will proceed parallel to the building construction.
Firdos Heights site plan and layout
4 drawings from the project's filings. Sign in free to see them.
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see it
🔒 Sign in free to see itIn context
489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.5 acres, this one is smaller than 51% of them.
92 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhanodra, Chorasi, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Two Six Lane Vups Including Re Wall, Service Road and Drain at New Ch. 31+050… — forest land use approved, 750 m away
- Industrial project by M/s. Jash Chem — environmental approval granted, 1.6 km away
- Industrial project by M/s. Jash Chem — cleared for impact study, 1.6 km away
- Industrial project by Bondkraft Adhesives LLP — cleared for impact study, 1.8 km away
- Halima Height — under environmental review, 1.8 km away
- Building project by EWS -II "Pradhan Mantri Awas Yojana" Surat Municipal… — environmental approval granted, 1.8 km away
- Project by M/s. Anupam Rasayan India Ltd. (Unit - 6) — initial checks, 1.9 km away
- Industrial project by Colour Plus Organics Private Limited — environmental approval granted, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.