Under environmental reviewBuildings & townships · Surat, Gujarat

Halima Height

Halima Height is a proposed building project in Gabheni, Majura, Surat, Gujarat. The site covers 1.4 acres. Its stated project cost is ₹31.8 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 21 Oct 2026).

See it on the live map All projects in Surat

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is Halima Height?

Halima Height is a proposed building project in Gabheni, Majura, Surat, Gujarat. The site covers 1.4 acres.

Who is building it?

The applicant is HINGORA INFrastructure limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Gabheni, Majura, Surat, Gujarat.

How big is it?

It has a stated cost of ₹31.8 crore and a site of 1.4 acres.

When was it filed?

The application was filed on 8 Aug 2026.

Project details

StatusUnder environmental review
Status since21 Oct 2026
Application filed8 Aug 2026
Approval soughtEnvironmental approval
Application typeNew project
SectorBuildings & townships
ApplicantHINGORA INFrastructure limited
Land area1.4 acres (0.6 ha)
Project cost₹31.8 crore
Village / localityGabheni
Taluk / tehsilMajura
DistrictSurat
StateGujarat
Location fromSite boundary on record
Our referenceWID-GJ-11515

What the filings say

What is planned

According to the applicant's project report, Halima Height is a proposed building project consisting of a single residential and commercial tower. The plans indicate the building will have two basement levels, a ground floor, and 13 upper floors, reaching an effective height of 38.45 metres. The total built-up area is estimated at 320.52 square metres per typical floor.

The ground floor is designed to accommodate commercial activities with seven shops (Shop-1 to Shop-7) and parking spaces. The upper floors are dedicated to residential units. The first floor includes six units and an open terrace. From the second to the 13th floor, the layout provides for nine residential units per floor.

Unit Details

FloorComponentDetails
Ground FloorCommercial7 Shops (Shop-1 to Shop-7)
1st FloorResidential6 Units (101-105, 107)
2nd-11th FloorResidential9 Units per floor (201-209 to 1101-1109)
12th-13th FloorResidential9 Units per floor (1201-1209 to 1301-1309)

Layout and design

The layout plan shows the project site is bounded by a 24.00-metre wide Town Planning (TP) road on one side and a 12.00-metre wide TP road on another. A 132 KV high-tension line runs along one boundary, with a building control line established at 12.20 metres.

The building footprint includes internal 6.00-metre wide roads for traffic circulation within the plot. The design incorporates two basement levels primarily for parking. The first basement and second basement are accessed via ramps with a 1:7 gradient. A garden area of 232.00 square metres is planned at one corner of the plot.

Water, power and access

The project report specifies a water requirement of 180 kilolitres per day (KLD). To manage wastewater, a Moving Bed Biofilm Reactor (MBBR) based Sewage Treatment Plant (STP) with a capacity of 180 KLD is proposed, occupying an area of 85.00 square metres.

For power backup, Diesel Generator (DG) sets are planned. The applicant also proposes to install a 32.5 KW rooftop solar system, requiring 1,567.77 square metres of terrace space. Two rainwater harvesting and recharge wells are included in the design. Access to the site is provided through entry and exit points on the surrounding TP roads.

Environmental safeguards

The applicant has budgeted ₹231.39 lakh for capital expenditure on environmental management during the operation phase, with an annual recurring cost of ₹25.76 lakh.

A green belt development plan covers 563.00 square metres, which includes a lawn and the plantation of 142 trees. The proposed species include Asopalav (45), Almond Tree (40), Neem Tree (30), and Gulmohor (27). The plantation is designed in two phases: fast-growing evergreen trees in the first phase, followed by trees with larger leaf surface areas 18 months later.

Solid waste management will involve an Organic Waste Converter (OWC) to handle an estimated 236.64 kg per day of wet waste. For fire safety, the building will be equipped with fire alarms, hooters, hose boxes, hose reels, and sprinklers, as well as a dedicated fire lift. Refuge areas are designated on the 6th and 8th floor landing levels.

Halima Height site plan and layout

4 drawings from the project's filings. Sign in free to see them.

Halima Height: Site layout: building footprint, internal roads, garden and parking (preview)🔒 Sign in free to see it
Site layout: building footprint, internal roads, garden and parking
Halima Height: Building elevation and sectional view showing floor levels (preview)🔒 Sign in free to see it
Building elevation and sectional view showing floor levels
Halima Height: Floor plans: ground floor shops and typical residential layouts (preview)🔒 Sign in free to see it
Floor plans: ground floor shops and typical residential layouts
Halima Height: Basement parking plans showing ramps and circulation (preview)🔒 Sign in free to see it
Basement parking plans showing ramps and circulation

In context

489 applications in Surat since January 2022 are in the same category (Buildings & townships): 376 approved, 79 filed or under review, and 34 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 1.4 acres, this one is smaller than 58% of them.

90 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Gabheni, Majura, Surat, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.